10-24-2006 VC SP-MPrepared by TBE Group MINUTES Anchorage Park Workshop • October 24, 2006 DATA COLLECTION UPDATE Preliminary Ecological underway -- to be complete early Nov Contacted previous engineers who worked on site - no surveys available Obtained dredge permit w! some cross sections for west channel Obtained some easement data SEACOAST UTILITY COORDINATION UPDATE Met w/ Utility and obtained maps of easements & facilities No topographic information Tower to come down in April 2007 Utility plans to maintain fenced area for pump degritting Would consider land trade if adjacent to pump PREAPPLICATION MEETINGS UDPATE Lead Agency will be SFWMD SFWMD does not favor Mangrove impacts on south Need to demonstrate avoidance and minimization of mangrove impacts Will receive impervious credit for shell rock and paved areas • Manatee Protection Act will dictate number of allowable dock spaces (still draft) -- - - - COUNCIL & ADVISORY BOARDS' PREFERRED- SITE PROGRAM- - - Rankings: A =high, B =Middle, C =Low A Dry Boat Storage Want paved, maintenance fi~ee, consolidate, fenced Existing 198 Want 200 but consolidated. Village Use Only. Need larger spaces A Wet Boat Slips Existing 35 Want 75+ Want one adjacent parking space for every wet boat slip 100 on waiting list Village Use Only Consider options on South, North, and Basin C High & Dry Storage Staff does not favor operation costs A Boat Ramp • Current 2 Widen with pier in middle Village Use Only Prepared by TBE Group Anchorage Park Minutes -October 24, 2006 Page 2 of 3 A Vehicular & Trailer Parkin - g Day Use Current 16. Want 25+, but larger spaces Village Use Only. A Green Space /Passive Park A Fishing Pier or Location A Dog Park A Pedestrian Trails B Boardwalk /Observation Platform B Kayak Storage /Ramp B Gazebo /Stage / Restroom Small stage with grass seating for 100 people Possible Wedding use A Buildings in Key West Style Architecture • Offices, Art, Activity - 4,000 sf (2 story OK) Maintenance - 2,000 sf Boating-area structure w/fish cleaning, restroom & concession -=size unknown Activities Building to Remain B Themed Lighting Lights planned for downtown. Wi11 adjust downtown lights to match this site Need better lighting for night use A Covered Shelters C Ballfields Other parks not on water provide this Possible backstop in open space A Volleyball Courts 2 Existing Want 2 sand courts A Tennis Courts 2 existing Want 2 courts. Existing cou~•ts in bad shape • A Playgrounds Want separate Tot Lot and Childrens' Playgrounds C Shuffle Board Prepared by TBE Group • • Anchorage Park Minutes -October 24, 2046 Page 3 of 3 C Skate Park B Water Fountain OR Entrance Feature C Aquatic -pool, spraygibund A Gated Access to Boat Area A Separation of boat traffic from pedestrians/activity areas Other Comments: Consider floating docks on south Consider relocating west bulkhead to expand basin on west side Review ownership/easement for SFWMD channel C-17 Developer wants to sell C-171and. Easement may be further south. Eliminate parking on Anchorage for safety Review reported wildlife in north side vegetation WORKING BUBBLE DIAGRAM CONCEPTS TBE will provide updated bubble diagram concepts by Nov 14 incorporating above program for t e o -owing: 1) Minimal Mangrove Impacts Option 2) North & South side Dock Option 3) Internal Basin Option 4) West Side Bulk Head Relocation PUBLIC INVOLVEMENT -January 17, 2006 •