2002-030 Catalfumo Contract for VH Renovation•
RESOLUTION 30-2002
A RESOLlJT10N OF TIIE VILLAGE COUNCIL OF THE VILLAGE OF NORTH PALM
BRACH, FLORIDA, AUTHORIZING AND DIRECTING THE MAYOR AND VILLAGE CLERK
70 ENTfsR INTO A STANDARD FORM OF AGREEMENT BETWEEN OWNER AND
CONTRACTOR, AIA DOCUMENT A101, WITH CATALFUMO CONSTRUCTION,1,7'D., A
FI.OKIDA ].IMITED PARTNERSHIP, ATTACHED AS EXHIBIT "A", WHICH AGREEMENT
PROVIDES FOR RENOVATION OF VILLAGE HALL; AND, PROVIDING FOK AN
EFFECTIVE DATE.
BF. 1T RESOLVED BY THE VILLAGE COUNCIL OF NORTH PALM BEACH. FLORIDA:
Section 1. The Village Council ofthe Village ofNorth Palm Beach, Florida, does hereby approve
the standard form of agreement between owner and contractor, AIA Document A101, with
Catalfumo Construction, Ltd., a Florida limited partnership, attached as Exhibit "A", which
agreement provides for renovation of Village Hall.
Section 2. 7'he Mayor and Village Clerk are hereby authorized and directed to execute the standard
form of agreement between owner and contractor with Catalfumo Construction, Ltd., set forth in
Exhibit "A" for and on behalf of the Village of North Palm Beach.
Section 3. This resolution shall take effect immediately upon its adoption.
PASSED AND ADOPTED THIS 25th DAY OF APRIL, 2002.
('Villa_e Seal) s ~ "
AYOR
n7°rl~s"r:
• ~ \ VILLAGE CLERK
A M E R 1 C A N I N S T I T U T E
•
O F A R C H I T E C T S
AJA Document A101
Standard Form of Agreement Between
Owner and Contractor
where the basis ojpayment is a
STIPULATED SUM
1987 EDI710N
THIS DOCUh1ENT HAS lMPORTA.k'T LEGAL CONSEQUENCES; COA'SULTATJON W/TH
A:V ATTORNEY /S ENCOURAGED WITH RESPECT TO !TS COMPLET/O:V OR bIODIF/CATIO;V.
The 1987 Edition of A/A Document A?01, General Conditions Dj the Contract Jor Corstrucrion, is adopted
in this document by reference. Do nor use with other genera! conditions unless this document it modified.
This document hu been approvtd and endorsed by The Associated Gentnl Contractors of America.
AGREEMENT t
made as of the day of in the year of
ftineteen-Htxx#ret#and Two thousand and two
BETWEEN the Owner: The Village of North Palm Beach
(;Fame and address) 501 U.S. Highway 111
North Palm Beach, FL 33408
and [he COnIC3000C: Catalfumo Construction, LTD, a Florida Limited Partnership
(.~'nn+e and address) by Catalfumo Construction, Inc., a Florida Corporation, it's
General Partner
4300 Catalfumo Way
Palm Beach Gardens, FL 33410
The Project is: '
(.~'nnre and tocnrion) Village Hall Renovations
North Palm Beach, FL
The Architect is: BEA International Inc.
(.Fame acrd ndclreu) 224 Datura Street, Suite S11
West Palm Beach, FL 33401
~e Owner and Contractor agree as set forth below.
Copyright 1915. 1918, 1925. 1937, 1951, 1958, 1961, 1963. 1967, 1974, 1977, ®1987 by The American Institute of Archl•
tests, 1735 Ncw York Avenue, N.VL'., Washingron, D.C. 20006. Reproduction o(the material herci r subsnntial quondon
o(Its provLsions without wcitten permission of the AIA violates the copyright laws of the Uni es and will be subject to
Iega1 prosecution.
AtA DOCUMENT A101 • OWNER~CONTRACT00. AGREEMENT • T~s'ELFTH EDITION •AIA• • 0198'
r,re MtearGnv rNSrlTVrE orwR[NtTE[T5. I Tf 5 NE W YORK ~vENI:E. N.W.. WASHINGTON, D.C. 10006
A101-1987 1
ARTICLE 1
' THE CONTRACT DOCUMENTS
• ThcContnctDocumentsconsistof[hisAgreement,ConditioreoftheContnc[(General,SupplemenuryandotherCondirioru),
Drawings, Specifications, addenda Lssued prior to execution of this Agreement, other documents listed in this Agreement and
plod ificatiotu issued after execution of this Agreement; these [orm the Contact, and are u fully a qn of the Contract as if atuched
ro this Agreement oc «pcated herein. The Contract represents the entire and integrated agreement between the panics hereto
and supersedes prior negotiations, rcpresenntioru or agreements, either written or oral. An enumeration of the Contract Docvmenu,
other than ~fodifintions, appears in Anicle 9.
ARTICLE 2
THE WORK OF THIS CONTRACT
The Contractor shill execute the entire Work dexribcd in the Contract Documenu, except to the extent specifically Indicated in
the Concoct Documents to be the responsibUity of others, or a5 follows:
ARTICLE 3
DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
3.1 The dace of commencement u the date from which [he Contract Time of Paragraph 3.2 is messured, and shall be the dare of
this Agreement, u Grst written above, unless a different dare is sated below or provision u made for the date ro be freed in a notice
ro proceed issued by the Owner.
/lnsrrs rhr du:r o/mmmnrcemenl. t/ it p,]/trs /rum shr dart o/ Uys Asrrrmrm or, i/npphm0rr. Jfntr lhaf thr Cnrr a iff Dr /r.<rtf Pr n .mri:r !o prrgrrd/
Date to be fixed in the Notice to Proceed.
Onicss the dare of commenttment is esnblished by a notice to proceed issued by the Owner, the Contractor shall noriN the
Owner in w~riring not Icss than five days before eommtncing the Vt'ork to permit [he timely Ning of mortgages, mechanic's liens
and ocher security interests.
3.2 The Contractor shall achieve Substantial Compierion of the entire Fork not later than 180 consecutive calendar ds
/(nsrrt (hr <alrnQur draft ur nom Drro/m/rnRrv do l's a/lrr fhr dolt 4J<unmrrnCr.nrnL ALO insrrf ngy reyuirrmrnfs/ur rurLCr Sub, « uuial Cumplrliwr of <rr~
In rn )wrfiau u/Ibe Ir'orR. If nbt srarrC rlsrvbrr~ in for Cunrran OrKrmunfs.J
from Notice to Proceed, and final completion no later than 60 days after the actual
date of substantial completion.
. subject to adjustments o(this Contract Time u providtd in the Contract Documents.
• fhurrf prurlsluns, i/ weft. Jr.r fiyu/rfnae damages relating ru/rain, rr lu rumptrtr nn lime.)
Liquidation Damages of $500.00 per day for each calendar day elapsing between the
established and the actual substantial completion dates and for each calendar day
elapsing between the established and the actual final comple ion dates.
AU DOCUMENT A101 • D~i'NER.CONTRAGTOR AG REEME.'rT • Tu'ELFTM EDITION • AIA~ m198 2
THE AMERICAN INSTITITE OF ARCHITECTS. r 735 NE1rr YORK A~'ENL'E, N.ss'., WASHINGTON, D C.2 A101.1987
ARTICLE 4
CONTRACT SUM
.1 The Owner shall pay the Contnaor in currcnt funds for the Con[naor's rfo a of the Contnct the Contnct Sumo[
One million four hundred forty two thousand, six ~iun ninety one Dollars
(f 1 442 , 691.00 ), subject to addi[ions and deduaiocu u provided rn the Con•
tract fsocumenu.
4.2 Thc Contnct Sum Ls bascd upon the following alccrnatu, !f any, which ue described In the Contnct DocumcnLS and are
hcreby accep[ed by the Owncr:
(Starr rbr numbrrr or orbn 1dmHJlcarlon oJorreprrd alr<rnar<r. I/drrtrtom on other alrrrnara art to G math try rbr Oumrr mbrequmr ro rbr rsrcurion of
rblr Ag.r<mrnq arrarb a rcbedulr oJrucb orbn alrrrnar<r ,booing rbr amount Jor each and rbe dote anti! u•Dlrb that amount tr raUd.J
Base bid amount, plus alternates as follows:
4.3 Uni[ prices, if any, are u follows:
None
•
#2 (22,483.) Deduct
#3 $9,936. Addition
AIA t>OCUHEHT A101 • OWNER~COMMCTOR AGREEMENT • TWELFTH EDITION • AIAr • O19R7
TH E AMERICAN INSTRUTE OF ARCHITECTS. 1735 NE W YORK AYENUE. N.W.. WASHINGTON. D C. aooos
A101-1987 3
ARTICLE 5
PROGRESS PAYMENTS
• 5.1 Bucd upon Applications for Payment submitted to the Architect by [he Contractor and Cenifinres for Payment Lssued by the
Architect, the Owner shall make progress payments on account of the Contract Sum [o the Contncror u provided below and
elsca•huc In the Contras[ Documents.
5.2 The period covered by each Application for Payment shall be one calendar mooch coding on the last day o[ the month, or u
fo8ows:
5.3 Provided an Application for Paymcnr B receiSed by the Architect not Uter than the 10th
day of amonth, the Owner shall make payment to the Contncror not lacer than
[he 25th day of the same month. (fan Applintion for Pa}•ment is received by the
Architect after the applicuion date fixed above, payment shall be made by the Owner not later than 30
days after the Arthitea receives the Applintion for Payment.
5.4 Each Application for Paynunt shall be based upon the schedule of values submitted b}'the Cor.tntto: in accordance with
the Contract Documents. The schedule of yylues shall allocate the entire Contract Sum among the various portions of the V(brk
and be prepared in such Corm and supported by such darn to subsmntiare its accuracy u the Archircu may require. This schedule,
unless objected to by the Architect, shall be used as a buii for reviewing the Contnccor's Applications for Payment.
5.5 Applications for Payment shall indicate the percentage of completion of each portion of nc~ f'or'.: u of the erd of the period
covered by nc~ Application for Payment.
5.6 Subjece ro the provisions of [he Contra Documents, the amount of each progress pa}'meat shall be computeQ as follows:
5.6.1. TakerhatporrionoRheConaaaSumproperlyallocabktotompleted~ibrkasdecerminedb}'mu!tiplyingthepercentage
completion of each portion of the ~~brk be the share of the tool Contncr Sum a!locued to that porton of the Vcbrk in ehe schedule
of values, less rctainage of ten percem
( 10 %^1. Pending final determinationofcoscto[he0a'nerofchangesintheIXbrk,amountsnotinthcdisputemaybe
included as provided in Subpangnph 7.3.7 of the Oenenl Conditions even though the Contact Sum hu no[ ycr been adjusted
by Change Order;
5.6.2 Add char po« ion of the Conrnct Sum properh' allunble to materials and equipment dcliccred and suinbly scored a the
site for subsequent incorpontiun in the completed ednswction (or, if approved in adyara by the Owner, suitably stored off the
site at a location agreed upon in writing). Itss retainage of ten
percent ( 10 % ):
5.6.3 Subtract the aggrcgxe of previous payments made by the Oamer: and
5.6.4 Subvaa amounts, if any. (or which nc~ Architect hu withheld or nullified a Cutifinte for Payment u provided in Pan-
gnph 9.5 of the General Conditions.
5.7 The progress payment amount determined in accordance with Paragraph 5.6 shad be (unhcr modified under the following
cirttlmsrances:
5.7.1 Add. upon Subsantial Completion of nc~ IX'ork, a sum sufficient to increue the total payments to
ninet percem( gp r)oftheComna
Sum, less such amounts u the Architect shall determine for incomplete VG'ork and unsettled claims; and
5.7.2 Add, if final completion of the vt'ock is thereafter materiath' delayed through no fault of the Contractor, any additional
amounts pa}'able in accordance with Subpangnph 9.10.3 of the General Conditions.
5.8 Reduction or limitation of reninage, if any, shall be u follows:
/!! r( if unrmlCd. (/ir•/ lu $uh>llrnlirtf (•OrrrrlfYliO/1 UJ fyY Cnri/Y tr'e/}. r4 Kthtft W rlnlif l4Y K(HI/I[rjft /YLAfPIft J2m (Dt pt'/a,vrfn+(YY Pr3CRRf in Sd)p(r/n'
g„q,h, i. r. ! un<f f. h1 tM.nr. rant! rAis is nr.f ncpluDUVf Ylsrvln•/r (n eGr Conrrua Oro umrnts. Irurrt Ar/r frt.risium/w maN /rdurrinn n/ IimircnienJ
•
AIA DOCUMENT At01 • O`a'NE0.~CONT0.+CT0R AGREE?LENT • Ta'EtiTN EDITION • A:A• • A101-1987 4
THE w>IE0.1Cn] t~>Tl iI:TE OF e0.CHITECTS. Ky5 NEU• YORK pytNCE. N w , `a .+SHI~CT09. D C
pnotoeop/Inq vlol+te+U. S. eopyngnt (t+n and la soolect to te9+I presec Wion.
ARTICLE 6
FINAL PAYMENT
• Final payment, constituting the entire unpaid balance of the Contact Sum, shall be rtudc by the Owner ro the Contnttor when (1)
the Contract hu been fully performed by the Contnttor except for the Contactor's resppruibiliry to corcect nonconforming
Work u provided In Subparagraph 12.2.2 of the General Conditions and to sat[sfy other requirements, Uany, which neccssarity
survive final paymcnr and (2) a fatal Certificate for Payment hu been Lssued by the Mchltett; such final p~ymcnt shall be tnadc by
the Owner not more than 30 days aher the Lsslrance of the Architect's final Certiflr~[e for Payment, or u follows:
ARTICLE 7
MISCELLANEOUS PROVISIONS
7.1 Where reference is made in this Agreement to a provision of the General Conditions or another Con[ract Document, the «('
ercnce refers to that provision u amended or supplemented b}' other provisions of the Contact Documents.
7.2 Payments due and unpaid under the Contra shall bear interest from the date payment 6 due a the ate sated bclon~, or in
the absence thereof, at the legal rate prevailing from time ro time at the plate where the Project u located.
(Insert /are o/inrcnst ag.red upon. !/any.)
(USUry fa uT Ond rrqui/rmrn!r under rbe Frdern(Trurb !n Ltnding Arr, Similo/ tmrt and fora! rOnrumer rrrdir (nu s and orbrr rrgularions at rbe Uu'nr/'f miA
Conlrruo/'t p/inrip0! plant o/bu31nrt1. (be (rxnfion O/!bt G/o)Kf and t/stu'bPt may al/rc! rbe ralidiry o/rbir p/orlflon Legaf adrfce sboum Dr obminrd
Yi(b rf3pKr (O defHi0nl O/ nlUdil4rnriOnf, rand nlf0 IC$n/dolg Ifqu!/rmPBrf L6b Of Y'grren diKfO3Y/H O/ Y'nit'Hl )
7.3 Other provisioru:
• ARTICLE 8
TERMINATION OR SUSPENSION
8.1 The Contract may be terminated by the Owner or the Contactor u provided In Aric 14 of the General Conditions
8.2 The Work may be suspended by the Owner u provided in Article 14 of the Ger~l~onditions.
AIA DOCUMENT A101 • O`>oNER<ONTRACTOR AGREEMEM • Tu'ELFTM EDITION • AIA~ • 0198X6'/
THE A.MERICA~INSTITUTE OF ARCNITECT5,1T;5 NEw YORK AVE"IUE.NK'., vrASHINGTON, O.C. 20006 A1O1"1987 5
WARNING: Un11GmaM pnolxopyln0 vlObt•r U.S. eopyrlOM Irrwf ~n0 h su0irel to Iran pmseculbn.
ARTICLE 9
ENUMERATION OF CONTRACT DOCUMENTS
• 9.1 Thc Contnc[ Documents, cxccpc for Moditica[iotu Luued a[[ec execution of this ABreemrn[, ue enumerated u follows:
9.1.1 Thc Agreemen[ Ls thlt executed Standud Form of Agreemrn[ Betwttn Owner and Contncror, AIA ppcumcnt A101,1987
Edition.
9.1.2 The Gcncnl Condidocu ue [he Gencni Condldotu of d[e Conuaa for.Cotutruction, AIA ppcumrnt A201, 1987 Edition.
9.1.3 Thc Supplementary and other Conditioru of the Contract ue thou mnnincd In the ProJea Manual deed
January, 2002 ,and ue u follows:
Document Title Pages
Supplementary Conditions to General Conditions SGC-i to SGC-13
9.1.4 Thc Specificaciotu are those contained in the Project Manual dated u in Subparagraph 9.1.3, and ue u follows:
(£irnrr rue rbr Sprc/¢arion7 beer Dr refer ro mi rabibir oaDCbed t0 [biS AgrrPmrn L)
Section Title Pages
Divisions 1 through 16, per attached exhibit
•
AU DOCUMEfIT A101 O`i'NE0.~CONTMCT00. AGREEAIE.NT • T'wELFTN EDITION • AIAa • OI p1p1.1987 6
THE Al1E0.1CAN INSTITUTE OF A0.CNITECTS. 17lS NEID YO0.K AvE7+l: E. N ~', 1['.~HINGTON, D C. a
D~OIO<opylnq rlolada V.S. eo DYNaAI laws snG is welad to bgal p,osecalion.
9.1.5 The Drawings are u follows, and arc dated 1/6/02
(firDrr I4r rbr Dinuingr Drir o• rr/rr ro an tab(blt aNOiWJ m r6U Ag•r•mrnL)
bey Tlde
Construction Documents per attached exhibit
unless a differen[ dart B shop•n bcloa•:
D1IC
9.1.6 The adJcnda, if amt are as follows:
lCttnlbcr
111
112
113
114
•
Date
Jan. 29, 2002
Jan. 29, 2002
Jan. 31, 2002
Feb. 4, 2002
Pottioru of addcnda rela[ing to bidding rcquircments arc nor part of the Conrncr
also enumcntcd in this Atticle 9.
Pages
Add 1-1 to Add 1-9
Add 2-1
Add 3-1
Add 4-1
the bidding requircmencs arc
AIA DOCUMEM At01 • OWNER~CONTMCTOR AGAEEME•R • TWELFTH EDITION • AIA~ • 0198 r
THE ANERICAN INSTITUTE OF ARCHITECTS. 1)SS NEts' YORK AVENUE. N.W., ta'ASHINGTON.O C.7
WARNING: Unik~nsW pholotolryln0 NOINN US. CopyAOAt W+ MBA b ryoJM tO N9v Fpa•outlon.
A101.1987 7
9.1.7 Onc~r documents, U any, forming pan of the Contnct Documcnls ue u follows: .
(LUr bnr any addiriorul docummrr rrbreb art 1nfmNd ro/orm pan oJfbt ConfraA DaCYmmfJ. 7be General Candirionf pnldde fbaf btdding r~m,tr„nmu racy
• ~ at adlvrifemrn(or ImimBOn fo bra. lnt(rucNOnr fo Bidden, tampp(e/ormf and fbe Contractor i 6fd an not port oJfbe Confratf pocummlt un ru mumerarrd
In rblr Agrrrmrm. 7bry tbould 6e (!rtes bne only !/intended fo be part of rbe Conlracf Docummfr.J
Performance Bond
Labor and Material Payment Bond
Subcontractor list, as submitted with bid as attached exhibit.
• `
This Agrccmcnt is entered into u of the day and yeu f rst written above and u executed in a[ lent thrte original copies of which
one is to be delivered to the Convactor, one to the Architect for use in the administntion of the Contract, and the remainder w rho
Owner. Catalfumo Construction, Ltd., a Florida
Limited Partnership `
By: Catalfumo Construction, Inc., a Flnrida
C~RACTOR Corporation, itS General Partner
1 ~n ~• ~p~T't~f~ ~t.~
(Sigrlnlure)
(Pn'nfed name and fi(le)
By: Stephen E. Fisher, Executive Vice
(Pnn(ed name and title) President
CAUTION: You should sign an original AIA document which has this caution printed in red.
1 I An original assures that changes will not be obscured as may occur when~ocumenls are reproduced.
n,
AIA DOCUMENT Af01 • OWNEA~CONTRACTOR AGREEMENT • TWELFTH EDITION • NAB • 01987
THE AMERICAN INSTITUTE OF ARCHITECTS, 17y5 NEW YORK AYENCE, N.W., W'ASMINGTON, D.C. 20006
A101.1987 B
ADDENDUM NO. 1
• VILLAGE HALL RENOVATION
FOR
VILLAGE OF NORTH PALM BEACH
NORTH PALM BEACH, FLORIDA
DATE: January 29, 2002 PROJECT NO. 01-0436
ARCHITECT/ENGINEER: BEA International, Inc.
224 Datura Street, Suite 511
West Palm Beach, FL 33401
GENERAL:
A. This Addendum modifies, changes from or adds to the Drawings and Project
Manual dated January 6, 2002, and shall become a part of the Contract
Documents.
B. Bidders shall acknowledge receipt of this Addendum in the space provided on
the Bid Form. Failure to do so maybe cause for disqualification of Bidder.
C. Acknowledgement ofAddendum One is also an acknowledgement of receipt
of Specification Section 08800 as originally issued. Due to a printing error,
some specification books did not originally include this section. By flax, on
01/23/02, each bidder registered with BEA as a plan holderwas forwarded an
additional copy of this section to insure all bidders had received it. If receipt
of this section did not transpire, contact BEA immediately to receive a copy.
ADDENDUM ITEMS:
Item No. 1, Bidding Requirements -Instructions to Bidders, Section INB:
A. Omit the word "Qualified" from 1.12, A.
B. Omit 1.17, B entirely and replace with:
"B. It is the intent of the Owner to award the contract to the lowest
responsible Bidder whose Bid is in conformance with the Bidding
Documents and does not exceed the funds available "
Item No. 2, Bidding Requirements -Asbestos Abatement, Section BIA:
A. Omit this section entirely.
B. The Owner is in the process on engaging an abatement firm to provide
• abatement services.
96188 ADD
• Item No. 3, Bidding Requirements -Bid Form -Lump Sum, Section BFL:
A. In the second paragraph of the Article entitled "Time," change to withdraw
period from 60 days to 90 days.
Item No. 4, Contract Requirements -Supplementary Conditions, Section SGC:
A. Under Paragraph 13.5, Testing and Inspections, insert the following:
"From the 8' and 9~' lines of Subparagraph 13.5.1, omit the words' and shall
bear all related costs of tests, inspections and approvals.' and end this
Subparagraph in the 13'" line after the word `approvals.' Omit the remainder
of the 13 line and all of the 14~' line."
Item No. 5, Specification Section 01010 - Summary of Work:
A. Under A cle 1.03, paragraph nge "7:00 P.M. and 7:00 A.M." to read
7:12-~M'. and 7:00 P.M."
$;ooR.11~ ~ s~~s~''' ~ r
Item No. 6, Specification Section 01400 - O ity Control:
A. Under Article 1.03, paragraph A, omit the last sentence entirely and replace
with:
'The Owner shall bear all cost for said services, however, it is the Contractors
responsibility to schedule all services needed and arrangefor payment bythe
Owner so as to not cause delays. The Contractor shall ascertain from the
Owner the period of advance notification required to make payments for said
services and work within those timeframes."
Item No. 7, Specification Section 01020 -Allowances
A. This section is attached and is added in its entirety.
Item No. 8, Specification Section 08212 -Stile and Rail Wood Doors
A. This section is attached and is added in its entirely.
Item No. 9, Specification Section 08520 -Aluminum Windows
A. Under Article 2.01, paragraph B, omit the language at the end of this
paragraph that reads "10 days prior to the bid date." and replace with "within
60 days after Notice to Proceed."
Item No. 10, Specification Section 10165 -Toilet Compartments
L_J
96188
ADD -
A. This section is attached and is added in its entirety.
• Item No. 11, Specification Section 16020 -Scope of Work (Electrical)
A. Omit Subparagraph 12, under Paragraph G of Article 1.1 in its entirety.
Item No.12, Specification Section 16740 -Telecommunications Structured Cabling
A. Omit Subparagraph 2f, under Paragraph A of Article 1.01 in its entirety.
Item No. 13, Drawing Sheet AD1.0 -Demolition Plan
A. Add the following:
"General Demolition Notes:
1. Stack-out location of proposed sidewalks to determine conflicts with
existing landscaping. The Carrotwood tree at the building's Southeast
corner to be removed if conflict occurs. Any existing palms that conflict
with new sidewalks are to be relocated to an on-site location to be
determined by the Owner or Architect.
2. All grassed areas disturbed by construction or demolition activity to be
regraded, sodded with Floratam and irrigated as soon as related work
activities have been completed. The building's exterior and grounds are
to be maintained with an undisturbed appearance whenever possible.
3. After removal and salvage of the existing emergency generator, its
associated fuel tank maybe removed for salvage or abandoned in place.
If abandoned in place, it is to be drained of all fuel, disconnected from all
below ground piping and filled with sand.
4. The Owner intends to mark existing fiber optic lines in and around the
building. Avoid contact with these lines at all cost. Prior to beginning any
demolition work, confirm with the Owner that all marking activity is
completed.
5. The building's file roof is approximately 2-years old. All due care to keep
it in its existing condition shall betaken. New roof penetrations shall be
made with compatible metal flashing and roofing membrane material.
Matching roof tiles are to be installed around said penetrations.
6. All of the building's flat roofs are to be replaced in accordance with
Section 07510. Schedule reproofing work as early as possible in the
construction process. Protecting new interior work from water damage
via a watertight building envelope is anticipated.
7. Wherever ramps, steps, sidewalks and other pedestrian connections to
the building are to be constructed, all demolition necessaryto accomplish
the Work is to be an assumed part of the Work. In all cases, provide
grading, paving, and/or sodding and irrigation to connect new structures
L_J
96188 ADD
A. Add a note pointing to room 31 c, Closet, stating "GWB @ 8'0"."
• B. Add a note pointing to room 13b, Water Fountains, stating "GWB ~ 7'0"
Item No. 17, Drawing Sheets A3.0, A3.1, A3.2 and A3.3 -Building Sections
A. Clarification: All notes stating "mud and tape joints" refers to the GWB sub-
ceiling installed on the bottom cord of all trusses throughout the facility to
create a complete, air tight division between the attic and the habitable
spaces.
Item No. 18, Drawing Sheet A5.0 -Wall Sections
A. On Section 5/A5.0, add a note pointing to the new footing that states "12" x
24" continuous footing with 3 #5s doweled 8" into existing footings at each
end :'
B. On Section 5/A5.0, add a note pointing to the new fill between the new and
existing slabs stating "8" minimum depth of well compacted fill under all
portions of new slab. Remove any impediments or provide thickened slab
conditions wherever this cannot be accomplished "
Item No. 19, Drawing Sheet A5.1 -Wall Sections
A. On Section 2/A5.1, add a note pointing to the new fill between the new ramp
and existing slabs stating.°8" minimum depth of well compacted fill under all
portions of ramp. Remove any impediments or provide thickened slab
conditions wherever this cannot be accomplished " .
B. On Section 2/A5.1, add a note pointing to the new CMU knee wall stating
`Typical knee. Construct all others as noted here."
C. On Section 3/A5.1, add a note pointing to the knee wall and foundation stating
'Typical, construct as noted elsewhere:'
D. On Section 3/A5.1, add a note.pointing to the ramp slab stating "See 2/A5.1
for reinforcing and vapor barrier requirements :'
Item No. 20, Drawings Sheet A6.0, Casework Details
A. On Section 2/A6.1, add a note pointing to the new fill between the new slab
and existing steps stating "8" minimum depth of well compacted fill under all
portions of ramp. Remove any impediments or provide thickened slab
conditions wherever this cannot be accomplished."
•
96188 ADD
with adjacent landscape or hardscape in a consistent and uniform
• manner."
B. Add note 19 to the Demolition Notes to read "19. Existing masonry wall
between existing Truck Bays and existing offices shall be removed entirely,
including tie beams and columns, and with special care. All attachments to
the existing roof structure and exterior walls shall be severed prior to its
removal."
C. Add note 20 to the Demolition Notes to read "20. With the exception of that
noted in #19, the removal of portions of existing masonry walls shall not
include the removal of existing tie beams or columns."
D. The Demolition Plan is modified to include note box 19 pointing to the
reference masonry wall.
E. The Demolition Plan is modified to include note box 20 pointing to the
reference masonry walls.
Item No. 14, Drawing Sheet AD2.0 -Demolition Elevations
A. Shutters shown on West Elevation, North Inside Elevation and North
Elevation are changed to be shown with dashed lines to be consistent with
their noted removal.
B. Add the following:
"General Demolition Notes:
1. All holes or chips in existing plaster surfaces, that are existing or newly
caused by the removal or demolition of items, shall be patched flush prior
to repainting.
2. Door and window openings, that are shimmed or furred into be smaller
than before, shall be plastered around their perimeter to achieve a flush
and matching condition in accordance with Section 09200."
Item No.15, Drawing Sheet A2.0 -Floor Plan
A. Add room number symbol 31 a, Closet, for the closet within room 31.
B. Add room number symbol 13b, Water Fountains, forthe water fountain alcove
within corridor 13.
C. Add door symbol 31 c for the bi-folding closet doors in room 31.
Item No. 16, Drawing Sheet A2.2 -Reflected Ceiling Plan
r 1
U
96188
ADD
• B. On Section 2/A6.1, add a note pointing to the thickened slab edge stating "8"
thickened edge with 2 #5s:'
C. On Section 2/A6.1, add a note pointing to the knee wall and foundation stating
`Typical, construct as noted elsewhere."
D. On Section 2/A6.1, add a note pointing to the new slab stating "See 2/A5.1 for
reinforcing and vapor barrier requirements."
E. On Section 2/A(i.1, add a note pointing to the existing slab on each side of the
knee wall stating "Saw cut and remove existing slab as needed to pour new
foundations. Comply with Building Department requirements when cutting
through asbestos the floors. Repour old slab over well compacted fill in
matching thickness and against a continuous Yz" isolation strip along both
sides of knee wall."
Item No 21, Drawings Sheet A7.0, Door and Window Details
A. Add a general note stating "Hollow Metal Door and Window Frames indicated
in non-standard sizes are to be custom fabricated as indicated."
B. The titles of details 4 and 10 are changed to "Head/Jamb/Sill" as they apply
accordingly. .
Item No. 22, Drawing Sheet A8.0, Door and Window Schedule
A. On the New High W indow Schedule, change all of the referenced jamb details
for windows HW03 through HW 19 to match the references for head and sill
as they are similar.
B. On the Door Schedule, change doors 32A, 34A, 346 and 35 from type E to
type F.
C. On the Door Schedule, add door 31c to read as follows:
"MARK: 31 c, OPENING SIZE: field determine, DOOR TYPE: E, DOOR
MATERIAL: wood, FRAME TYPE: 2, FRAME MATERIAL: metal, DETAILS:
none, HDWR: HW-11, LABEL: none, REMARKS: single bi-fold door"
D. On frame type 7, add a 2"sill to each sidelight.
E. On the New High Window Schedule, change the jamb detail reference for
HW22 from to "11/A7.0:'
•
96188
ADD
F. Add a general note stating that "All windows and.side lights indicated to be of
• the material "IMPCT' are to be impact resistant window assemblies complying
with Section 08520."
Item No. 23, Drawing Sheet A8.1, Room Schedules
A. On the Room Finish Schedule, add rooms 13b, Water Fountains, and 31 a,
Closet. These rooms will read as follows:
"ROOM N0.:13b, DESCRIPTION: water fountain alcove, FLOOR: stone 1, 2,
3, 4, BASE: CA-STO, NORTH WALL: WD-PNLi/GONG-P, EAST WALL: WD-
PNLi/GONG-P, WEST WALL: WD-PNLi/GONG-P, SOUTH WALL: none,
CEILING MATERIAL: GWB, CEILING HEIGHT: 7' - 0", REMARKS: none"
and
"ROOM NO.: 31a, DESCRIPTION: closet, FLOOR: CPT-1, BASE: WB-1,
NORTH WALL: PT-2, EAST WALL: PT-2, WEST WALL: PT-2, SOUTH
WALL: PT-2, CEILING MATERIAL: GWB, CEILING HEIGHT: 8' - 0",
REMARKS: none"
B. In the Room Finish Schedule, change the following designations:
1. West wall of Room 01, Main Lobby, to "PT."
2. South wall of Room 13, South Corridor, to "PT."
3. North wall of Room 13a, Corridor-A, to "WD-PNLi/GONG-P."
4. East wall of Room 13a, Corridor-A, to "none."
5. West wall of Room 13a, Corridor-A, to "PT."
6. South wall of Room 13a, Corridor-A, to "WD-PNLi/GONG-P."
7. North wall of Room 33, North Corridor, to "PT."
8. North wall of Room 33a, Corridor-B, to "VVD-PNL1/GONG-P."
9. East wall of Room 33a, Corridor-B, to "none"
10. West wall of Room 33a, Corridor-B, to "PT."
11. South wall of Room 33a, Corridor-B, to "VVD-PNL1/GONG-P."
12. North wall of Room 33b, Corridor-C, to "PT."
C. In the Legend of the Room Fipish Schedule, change wall finish designation
"PT-1" to "PT," and change wall finish designation CONC-P from meaning
"conc. pavers" to meaning "cast stone veneer."
Item No. 24, Drawing Sheet P-2, Plumbing Floor Plan:
A. On the South side of the floor plan, change the note adjacent to the 2 YZ" CW
line from reading "See civil plans for continuation." to read "Provide new tap
and water service at closet point and in compliance with all requirements of
Sea Coast Utilities. Provide 1 'h" meter at street and extend 2 Yz" type K
copper line from meter to building "
•
96188 ADD 1
B. In the Northeast quadrant of the floor plan, change the note that reads
• "Existing 4" sanitary line in crawl space. Verify exact location." to read
"Existing 4" sanitary line below floor slab. Verify exact location."
C. In the Southwest quadrant of the building, revise the 4" sanitary line exiting
the building to the north to connect to the existing floor drain to the east. Omit
note that states "See civil plans for continuation ° and add a note pointing to
the existing floor drain that states "Connect 4" sanitaryat e~osting floor drain to
be abandoned. Verify location and elevation of existing sanitary line prior to
installing any new work."
Item No. 25, Drawing Sheet E-1, Electrical Demolition Plan:
A. Omit General Demolition Note "F' in its entirety.
END OF ADDENDUM
•
96188 ADD
INSERT 3 SPECIFICATION SECTIONS
•
•
96188
ADD 1
SECTION 01020 -CONTINGENCY ALLOWANCES
r1
LJ
PART1-GENERAL
1.01 REQUIREMENTS
A. Provide Cash Allowances in the contract sum, in the amounts shown
below, for the performance of the following work in accordance with the
General Conditions of this contract.
1. Monetary allowance to be used only for adjustments in the contract
sum to cover cost of modifications requested by the Owner or
authorized representatives and as approved by Change Order.
2. Where the allowance is for the purchase of materials only, include
in the base contract sum the cost of acceptance of delivery,
handling, storage, and protection; installation, including ancillary
materials, equipment and labor; and overhead and profit. Base cost
on accurate take-off of the amount of work necessary to comply
with the requirements of the drawings and specifications.
B. Comply with the requirements of the drawings and specifications in
performing work covered by cash allowances.
1.02 LUMP SUM OF ALLOWANCES - $20,000 for disbursement
1.03 USE OF ALLOWANCES
A. Funds will be drawn from allowances only approved Change Order.
B. At close-out of this contract, fund remaining in this allowance will be credit
to the Owner. '
C. It is anticipated that the Allowance Funds will initially be used for the
following:
1. Building Signage - $10,000.00
2. Landscaping, irrigation and miscellaneous site work - $10,000.00
END OF SECTION
•
BEA International
01-0436
010
Village of North Palm Beach
Village Hall fienovations
SECTION 08212 -STILE AND RAIL WOOD DOORS
•
PART1-GENERAL
1.1 SECTION INCLUDES:
A. Stile and rail wood doors.
B. Wood door frames.
C. Factory finishing stile and rail wood doors.
1.2 SUBMITTALS
A. Product Data: For each type of door. Include details of construction and
glazing. Include factory-finishing specifications.
B. Shop Drawings: Indicate location, size, and hand of each door; elevation
of each kind of door and door frame; construction details not covered in
Product Data, including those for stiles, rails, glazing, and moldings
(sticking); and other pertinent data.
1. Indicate dimensions and locations of mortises and holes for
hardware.
2. Indicate doors to be factory finished and finish requirements.,
C. Samples for Verification: Corner sections of doors approximately 8 by 10
inches (200 by 250 mm) showing edges, faces, joinery, and material
qualities of typical stile, rail, molding, and glazing for each door type.
Provide finish sample with same materials proposed for factory-finished
doors.
D. Product Certificates: Signed by door manufacturers certifying that the
products furnished comply with requirements of SBCCI and Dade County
product approval passing wind load and missile impact tests.
E. Code Certificates: Provide the following:
1. Metro Dade County Product Approval Certification, or
2. Provide certification by the manufacturer showing that each type,
grade and size of unit complies with requirements where the
manufacturer's standard units have been tested in accordance with
specified tests and meet performance requirements specified for
the SBCCI Codes for wind resistance and missile penetration.
Where such testing has not been accomplished, perform required
u
BEA International
01-0436
082
Village of North Palm Beach
Village Hall Renovations
•
tests through a recognized testing laboratory or agency and provide
certified test results.
1.3 .QUALITY ASSURANCE
A. Source Limitations: Obtain stile and rail wood doors through one source
from a single manufacturer.
B. Quality Standard: AWI's "Architectural Woodwork Quality Standards" for
grade of door, construction, finish, and other requirements.
C. Safety Glazing: Provide products complying with ANSI 297.1 and testing
requirements of 16 CFR, Part 1201, for Category II materials, unless
those of Category I are expressly indicated and permitted.
D. Exterior doors and frames, including glazing, shall meet or exceed Palm
Beach County Building Codes for wind resistance and missile penetration.
Provide test data, testing lab certifications, engineering data signed and
sealed by a State of Florida registered professional engineer.
1.4 DELIVERY, STORAGE, AND HANDLING
A. Protect frames and doors during transit, storage, and handling to prevent
damage, soiling, and deterioration. Comply with requirements of
referenced standard and manufacturer's written instructions. Individually
package doors and frames in plastic bags or cardboard cartons.
B. Mark each door with individual opening numbers used on Shop Drawings.
Use removable tags or concealed markings.
•
1.5 PROJECT CONDITIONS: Environmental Limitations: ~ Do not deliver or install
doors until conditions for temperature and relative humidity have been stabilized
and will be maintained in storage and installation areas during the remainder of
the construction period to comply with requirements of the referenced quality
standard for Project's geographical location.
PART2-PRODUCTS
2.1 STILE AND RAIL DOORS
A. Construction, General: Comply with the following requirements:
1. Grade of Doors for Opaque Finish: Custom.
2. Wood Species and Cut for Opaque Finish: Mahogany, plain
sawed/sliced stiles and rails.
BEA International Village of North Palm Beach
01-0436 Village Hall Renovations
0821
3. Stile and Rail Construction for Transparent Finish: Clear lumber;
• may be edge glued for width. Select stock for similarity of grain
and color, and arrange for optimum match between adjacent
pieces.
4. Stile and Rail Widths: Manufacturer's standard, but not less than
the following:
a. Stiles, Top and Intermediate Rails: 5-3/8 inches (137 mm).
b. Bottom Rails: 11-3/8 inches (289 mm).
5. Molding Profile: Manufacturer's standard.
6. Glazing: Laminated glass gray tinted, thickness as required for
missile impact resistant codes, but not less than 9/16 inch.
2.2 FABRICATION
A. Provide doors with factory fabricated solid. wood frames of same material
as doors.
B. Factory fit doors to suit frame-opening sizes indicated, with the following
uniform clearances and bevels, unless otherwise indicated:
1. Clearances: Provide 1/8 inch (3.2 mm) at heads, jambs, and
between pairs of doors. Provide 3/8 inch (10 mm) from bottom of
door to top of threshold.
2. Bevel non-fire-rated doors 1/8 inch in 2 inches (3-1/2 degrees) at
lock and hinge edges. ,
C. Factory machine doors for hardware that is not surface applied. Locate
hardware to comply with DHI-WDHS-3. Comply with final hardware
schedules, door frame Shop Drawings, DHI A115-W series standards,
and hardware templates.
D. Glazed Openings: Install laminated glazirig using manufacturer's
standard elastomeric glazing sealant complying with ASTM C 920.
Secure glazing in place with removable solid wood stops.
E. Factory treat exterior doors after fabrication with water repellent to comply
with NWWDA I.S.4. Flash top of outswinging doors with manufacturer's
standard metal flashing.
2.3 FACTORY FINISHING
A. General: Comply with referenced quality standard's requirements for
factory finishing.
B. Finish wood doors at factory.
• BEA International Village of North Palm Beach
01-0436 Village Hall Renovations
0821
C. Comply with requirements indicated for grade, finish system, and sheen.
• 1. Grade: Custom.
2. Finish: Furniture quality, exterior grade, white to match fascias.
3. Effect: Semifilled finish.
4. Sheen: Satin.
2.4 BIFOLD LOUVER DOORS
A. Construction General: Comply with the following requirements:
1. Custom grade: Southern pine.
2. Fully louvered.
3. Provide pre-packaged unit, side hinged, top guide rail with pull
knobs.
4. Finish: Opaque.
PART 3 -EXECUTION
3.1 EXAMINATION
A. Examine rough openings before installing door frames and hanging doors.
1. Verify that openings comply with indicated requirements for type,
size, location, and swing characteristics and that frames can be
installed with plumb jambs and level heads. ,
2. Reject frames and doors with defects.
B. Proceed with installation only after unsatisfactory conditions have been
corrected. ,
3.2 INSTALLATION
A. Hardware: For installation, see Section 08710.
B. Manufacturer's Written Instructions: Install wood doors to comply with
manufacturer's written instructions, referenced quality standard, and as
indicated.
C. Factory-Fitted Doors: Align in frames for uniform clearance at each edge.
D. Factory-Finished Doors and Frames: Restore finish before installation, if
fitting or machining is required at Project site.
3.3 ADJUSTING AND PROTECTING
• A. Operation: Rehang or replace doors that do not swing or operate freely.
BEA International Village of North Palm Beach
01-0436 Village Hall Renovations
0821
•
B. Finished Frames and Doors: Refinish or replace frames and doors
damaged during installation.
C. Protect frames and doors as recommended by door manufacturer to
ensure that wood frames and doors are without damage or deterioration
at the time of Substantial Completion.
END OF SECTION
•
BEA International
01-0436
0821
Village of North Palm Beach
Village Hall Renovations
SECTION 10165 -TOILET COMPARTMENTS
L~
PART 1 -GENERAL
1.01 SUMMARY
A. Provide all labor, materials, tools, fabrications, reinforcement, equipment and
services for solid surfacing toilet partitions as specified in 06600 and herein
and/or shown, detailed, scheduled, implied, required or otherwise indicated to
provide a complete and proper installation.
B. Completely coordinate with Work of all other trades.
C. Related Work
1. General Conditions
2. Section 06600 and all Contract Documents
1.02 SUBMITTALS
A. Product Data
1. Materials List.
2. Manufacturers Specifications.
3. Manufacturers Instructions.
B. Shop Drawings
1. Structural support structure.
2. Layout and details of partition.
1.03 QUALITY ASSURANCE: Use adequate numbers of skilled workmen who are
thoroughly trained and experienced in the necessary crafts and who are completely
familiar with the specified requirements and the methods needed for proper
performances of the Work of this Section.
1.04 DELIVERY, STORAGE AND HANDLING
A. Store partitions inside an air conditioned building a minimum of 48 hours prior
to installation.
B. Deliver anchorage hardware as required for installation preparation.
1.05 JOB CONDITIONS
A. Verify Dimensions.
• B. Verify Structural Framing.
BEA International Village of North Palm Beach
01-0436 Village Hall Renovations
1016
PART 2 -PRODUCTS
• 2.01 ACCEPTABLE MANUFACTURERS
A. .Partition system panels to be Corian as specified In 06600.
B. Partition system hardware from an acceptable manufacturer who:
1. Routinely installs partition systems from Corian.
2. Produces and will supply a hardware package specificallydesigned for
the 3/4" thick Corian panels.
3. Will accept the Corian panels as specified in 06600 into their partition
assembly package and provide a warranty for the entire toilet
compartment assembly as their own and as if provided entirely from
them as a single package and source of responsibility.
4. Subject to specification compliance and acceptance of the above,
manufacturer's providing the toilet compartment assemblies may
include Ampco Products, Inc., Accurate, Capitol Partitions, Global and
Misco Partitions Corp.
2.02 MATERIALS
A. General: Provide material that have been selected for surface flatness and
smoothness. Exposed surfaces that exhibit pitting, seam marks, roller marks,
stains, discoloration, telegraphing of core, or other imperfections on finished
units are not acceptable.
B. Panels shall be as specified in 06600.
C. Stile Shoes and Caps: Shall be 20 gage ASTM`A-i67, Type 304 stainless
steel, not less than 3" high, Number 4 Satin (brushed) finish.
D. Brackets: Standard design for attaching panels to walls, stiles to walls, and
panels to stiles of the following material:
1. Overhead braced partitions shall be satin anodized Type 6463-T5
aluminum hardware. ,
2. Unbraced panels, such as urinal screens, shall be attached with two
36-inch long angled brackets, satin anodized, Type 6463-T5.
E. Overhead Bracing: Continuous extruded aluminum, anti-grip profile, with
clear anodized finish. Headrail returns as shown on shop drawings.
F. Anchorage and Fasteners: Standard chromium-plated exposed fasteners are
finished to match hardware with theft-resistant type heads (one-way). All
concealed steel fasteners shall be azinc-plated, rust-resistant, protective
coating. All fasteners shall be pre-packed, marked and labeled for ease of
• identification.
BEA International Village of North Palm Beach
01-0436 Village Hall Renovations
1016
2.03 FABRICATION
• A. General: Furnish standard doors, panels, screens, and stiles fabricated for
compartment system. Furnish units with cutouts and drilled holes to receive
compartment hardware as indicated.
B. Door Dimensions: Unless otherwise indicated, furnish 24" wide in-swing
doors for ordinary toilet compartments and minimum 32"wide (clear opening)
out-swing doors for compartments that meet the requirements of the
American with Disabilities Act (ADA).
C. Restroom Compartments, Modesty Panels and Sight Screens: Solid
Surfacing, 3/n" thick as specified in 06600. All edges shall be free of milling
marks.
D. Construction Types of Restroom Compartments, Modesty Panels and Sight
Screens
1. Overhead Braced: Furnish galvanized steel supports and leveling
bolts at stiles to suit floor conditions as recommended by
manufacturer. Make provisions for setting and securing overhead
bracing at the top of each site. Provide shoe at each stile to conceal
supports and leveling mechanism.
2. Floor Mounted: Furnish galvanized steel anchorage devices complete
with threaded rod, lock washers, and leveling adjustment nuts at stiles
to permit structural connection at floor. Provide shoe at each §tile.
E. Hardware: Furnish hardware to comply with ANSI A117.1 and Title III of the
Americans with Disabilities Act (ADA) follows:
1. Hinges: Supplytwo heavy duty extruded satin anodized type 6463-T5
aluminum hinges (three hinges for doorwidths exceeding 26"). Hinges
shall wrap around stile and door components, be reinforced with steel
supports, and be fully adjustable for door positioning. All hardware
mounted with theft resistant "thru-bolts "
2. Latch and Keeper: Heavy duty extruded satin anodized type 6463-T5
aluminum side latch and keeper with emergency release.
3. Coat Hook: Cast chrome plated non-ferrous metal coat hood (O/S)
and/or combination hook bumper (i/S).
4. Door Pull: Heavy duty cast satin anodized aluminum. ,
PART 3 -EXECUTION
3.01 INSPECTION
A. Verify suitability of substrate to accept installation.
• B. Correct leveling bars.
BEA International Village of North Palm Beach
01-0436 Village Hall Renovations
10185
C. .Installation constitutes acceptance of responsibility for performance.
C
3.02 INSTALLATION
A. Install partition in a rigid, straight, plumb and level manner, laid out as
indicated.
B. Clearances
1. Between pilasters and panels: Yz" (12 mm), maximum.
2. Between panels and walls: 1" (25 mm), maximum.
3. Between doors and pilasters: 3/16" (4.5 mm), maximum.
C. Secure panels to wall with minimum of two stirrup brackets attached near top
and bottom of panel.
1. Locate wall brackets so that holes for wall anchorages occur in
masonry or file joints.
2. Use manufacturer's recommended anchoring devices, as indicated on
approved shop drawings.
D. Secure pilasters to structured framing system with indicated anchorage
devices.
1. Level, plumb and tighten installation with leveling devices.
2. Set tops of fully closed doors level with tops of pilasters.
3. Set pilasters units with anchorages bolted to structured framing.
E. Adjust and lubricate hardware for proper operation after installation.
1. Set hinges on in-swing doors to hold doors open approximately 30
degrees from closed position when unlatched.
2. Set hinges on out-swing doors and entrance swing doors, to return to
fully closed position.
3.03 ADJUST AND CLEAN
A. Protect units after erection so that there will be no indication of use or damage
at time of acceptance by Owner.
B. Replace damaged work as directed.
C. Perform all final adjustments to pilaster leveling devices, door hardware, and
other operating parts of assemblyjust prior to final inspection.
D. Clean exposed surfaces of partitions, hardware, fittings and accessories, and
touch up minor scratches and other finish imperfections using materials and
methods recommended by manufacturer.
• END OF SECTION
BEA International Village of North Palm Beach
01-0436 gillage Hall Renovations
1016
•
i
•
=' LIBERTY
= ~ BOND SERVICES
Bond Number: 9640ot 328
600 West Germantown Pike, Suite 300
Plymouth Meeting , PA. 19462
Ph. (610)832-8240
Bond No. 964001328
KNOW ALL MEN BY THESE PRESENTS, that we
Catalfumo Construction Ltd.; 4300 Catal fumo May, Palm Beach Gardens, FL 33410
as principal (the `Principal"),
and LIBERTY MUTUAL INSURANCE COMPANY, a Massachusetts mutual insurance company, as surety (the
"Surety"), are held and firmly bound unto
The Village of North Palm Beach; SOl U.S. Hi gheay i1, North Pale Beach, FL 33408
the penal sum of
as obligee (the °Obligee"), in
One Million Four Hundred Forty Teo Thousand Six Hundred Ninety One and 00/100--
DOllafs ($ 1,442,691.00 ),
for the payment of which sum well and truly to be made, the Principal and the Surety, bind ourselves, our heirs,
executors, administrators, successors and'assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has by written agreement, dated the Za,p day of Y>7 LaIL ,
entered into a contract (the "Contract") with the Obligee for ~~
Village Hall Renovations; North Palm Beach, FL
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal shall promptly and
faithfully perform the Contract, then this obligation shall be null and void; otherwise it shall remain in full force and
effect.
PROVIDED AND SUBJECT TO THE CONDITIONS PRECEDENT:
Whenever the Principal shall be, and declared by the Obligee to be in default under the Contract, the Obligee
having performed the Obligee's obligations thereunder, the Surety may promptly remedy the default, or shall
promptly:
1.1 Arrange for the Principal, with consent of the Obligee, to perform and complete the Contract; or
1.2 Undertake to perform and complete the Contract itself, through its agents or through independent
contractors; or
1.3 Obtain a bid or bids from alternative contractors to complete the Contract in accordance with its terms and
conditions, and upon determination by the Surety of the lowest responsible bidder, or if the Obligee elects,
upon determination by the Obligee and the Surety jointly of the lowest responsible bidder, arrange for a
contract between such bidder and the Obligee, and make available as work progresses (even though
there should be a default or a succession of defaults under the contract or contracts of completion
arranged under this paragraph) sufficient funds to pay the cost of completion less the balance of the
contract price; but not exceeding the amount set forth in the first paragraph of this bond. The term
"balarice of the contract price," as used in this paragraph, shall mean the total amount payable by the
Obligee to the Principal under the Contract and any amendments thereto, less the amount properly paid
by the Obligee to the Principal; or '
1.4 Waive its right to perform and complete, arrange for completion, or obtain a new contractor and with
reasonable promptness under the circumstances:
a. After investigation, determine the amount for which it may be liable to the Obligee and, as soon as
practicable after the amount is determined, tender payment therefor to the Obligee; or
b. Deny liability in whole or in part and notify the Obligee citing reasons therefor.
PERFORMANCE BOND
LMIC-5100 Page 1 or2 Rev. 03/28/2000
2. Notwithstanding any other provision of this bond or the Contract, or otherwise, the Surety is not responsible for
and shall not be held liable to the Obligee for any hazardous waste removal and the Surety shat! not be held
liable to, or in any other respect be responsible to, the Obligee by way of indemnity, claims or otherwise, or to
any public authority or to any other person, firm or corporation, for or on account of any fines or claims by any
• public authority or for bodily injuries or property damage to any person or thing, including, but not limited to,
injury or damage due to the release or threat of release of hazardous substances of any kind or damage to
real estate or to the environment or clean-up costs or other damages of whatever kind or nature arising out of
any act of commission or omission by the Principal, the Principal's agents, servants, employees,
subcontractors or suppliers or any other person in connection with the performance of the Contract. This
limitation applies regardless of when any such fine is assessed, claim is made, or injury, damage, release or
threat of release occurs and without regard to any term or condition of the Contract.
3. The Surety hereby waives notice ofany-alteration or extension of time made by the Obligee.
4. Any suit under this bond must be instituted before the expiration of one (1) year from the date on which the
Principal ceased to work on the Contract or such time period as otherwise permitted by relevant statute. If the
provisions of this paragraph are void or prohibited by law, the minimum period of limitation available to sureties
as a defense in the jurisdiction of the suit shall be applicable.
5. No right of action shall accrue on this bond to or for the use of any person or corporation other than the
Obligee named herein or the heirs, executors, administrators or successors of the Obligee.
6. Any claims must be presented in writing to Liberty Mutual Insurance Company to the attention of the Surety
Law Department at the above address.
DATED as of this ~-^+ day of ~ p+A~
~.
WITNESS/ATTEST:
Catalfumo Constructi
~~rtpedrs7~i~dobyat~ona
on a
Ltd., a flori da Limited
a ns£r c ion Inc A
Title:
LIBERTY MUTUAL INSURANCE COMPANY
(Surety)~/,'
By: ~y', v^ (Seal)
Attorney-In-Fact
Brett Rosenhaus. and Florida Resident Agent
Inquires: 727-535-3510
•
LMIC-5100 ~ Page 2 of 2 Rev. 0328/2000
•
•
=' LIBERTY
BOND SERVICES
Bond Number: %4001328
PAYMENT BOND
600 West Gerrnant°wn Pike, SuRe 300
Plymouth Meeting, pq, igg82
Ph. (610) 632-9240
KNOW ALL MEN BY THESE PRESENTS, that we
Catalfumo Construction Ltd.; 4300 Catalfuna May, Pal^ Beach,Gardens, FL 33410 (561) 694-3000
as principal (the "Principal"),
and Liberty Mutual Insurance ~om~a~1~ ~ A~assa~hl~set~s ml~alar~ts~a c~~o~~g~,~as surety (the "Surety"), are
held and firmly bound unto 1 5 Berr y tree , son,
The Village of North Palm Beach; 501 U. S. Highmay #1, North Paln Beach, FL 33408
as obligee (the °Obligee"),
in the penal sum of
One Million Four HuridredGForty Teo Thousand Six Hundred Ninety One and 00/100---
uonars (~ ~ ~~~~O71:w )
for the payment of which sum well and truly to be made, the Principal and the Surety, bind ourselves, our heirs,
executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has by written agreement dated the 7~ day of t'1~~, ZeVZ
entered into a contract (the "Contract") with the Obligee for
Village Hall Renovations; North Pal^ Beach, FL
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the Principal shall promptly
make payment to all Claimants, as hereinafter defined, for all labor and material used or reasonably required for
use in the performance of the Contract, then this obligation shall be null and void; otherwise it shall remain in full
force and effect.
PROVIDED AND SUBJECT TO THE CONDITIONS PRECEDENT:
1 A "Claimant" is defined as one having a direct contract with the Principal or with a subcontractor of the
Principal for labor, material, or both, used or reasonably required for use in the performance of the
Contract, labor and material being construed to include that part of water, gas,. power, light, heat, oil,
gasoline, telephone service or rental of equipment directly applicable to the Contract.
2. The Principal and the Surety hereby jointly and severally agree with the Obligee that every Claimant, who
has not been paid in full before the expiration of a period of ninety (90) days (or such lesser or greater
time period as otherwise permitted by relevant law) after the date on which the last of such Claimant's
work or labor was done or performed, or materials were furnished by such Claimant, may sue on this bond
for the use of such Claimant, prosecute the suit to final judgment for such sum or sums as may be justly
due Claimant, and have execution thereon. The Obligee shall not be liable for the payment of any costs or
expenses of any such suit.
3. No suit or, action shall be commenced hereunder by any Claimant:
LMIC-5200
(a) Unless Claimant, other than one having a direct contract with the Principal, shall have given written
notice to the Principal and the Surety within ninety (90) days (or such lesser or greater time period as
otherwise permitted by relevant law) after such Claimant did or performed.the last of the work or.labor,
or furnished the last of the materials for which said dlaim is made, stating with substantial accuracy
the amount claimed and the name of the party to whom the materials were furnished, or for whom the
work or labor was done or performed. Such notice shall be served by mailing the same by registered
mail or certified mail, postage prepaid, in separate envelopes addressed to the Principal and Surety.
The Principai may be served at any place where an office is regularly maintained for the transaction of
business, or in any manner in which legal process may be served in the state in which the aforesaid
~ of 2 ftev. 03/28/2000
•
project is located, save that such service need not be made by a public officer. The Surety may be
served to the attention of The Surety Law Department at the above-listed address.
(b) Other than in a state court of competent jurisdiction in and for the county or other political subdivision
of the state in which the project, or any part thereof, is situated, or in the United States District Court
for the district in which the project, or any part thereof, is situated, and not elsewhere.
(c) After the expiration of one (1) year (or such lesser or greater time period as otherwise permitted by
relevant law) following the date on which the Subcontractor provided the last laborandlor materials to
the project. If the provisions of this paragraph are void or prohibited by law, the minimum period of
limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable.
4. Surety shall have no liability to any Claimant under this Bond for any amount unless it is due and owing to the
Claimant by the Principal pursuant to the express terms of the contract between the Principal and Claimant or,
if the Claimant does not have a direct Contract with Principal, pursuant to the terms and conditions of the
Contract between the Claimant and the Subcontractor to the Principal. The Bond incorporates all of the
Principal's contractual defenses, including but not limited to pay-if-paid provisisions, whereby payment to the
Claimant is subject to the condition precedent of the Obligee's payment to the Principal, and other limitations
on amounts due under the Contract between Principal and Claimant.
5. The amount of this bond shall be reduced by and td the extent of any payment or payments made in good faith
hereunder, inclusive of the payment by the Surety of mechanics' liens, which may be filed of record against
such improvement, whether or not claim for the amount of such lien be presented under and against this
bond
DATED as of this zMo
WITNESS/ATTEST:
day of m~~ Z~~
Catalfumo Constructs on, Ltd., a Florida Li sited
Partnership, by Catalfunq Constructs on, Inc., a Florida
THIS BOND HERESY IS AMENDED SOTHATTNE PROVISIONS AND
LIMITATIONS OF SECTION 255.05 OR SECTION J13.23 FLORIDA
STATUTES, WHICHEVER IS APPLICABLE, ARE INCORPORATED
iiEREtN BY REFERENCE.
LIBERTY MUTUAL INSURANCE COMPANY
(Surety)
By:_ (''" ` -" (Seal)
Brett Rosenhaus Attorney-In-Fact
and Flocida Resident Agent
lr
u
LMIC-5200
2 oft
Rev. 03/28!2000
THIS POWEfl OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND.
837
This Power of Attorney limits the acts o1 those nametl herein, and they have no authority to bind the Company except In the manner antl to the
extent herein slated.
LIBERTY MUTUAL INSURANCE COMPANY
• BOSTON, MASSACHUSETTS
POWER OF ATTORNEY
KNOW ALL PERSONS BY THESE PRESENTS:
That Libeny Mutual Insurance Company (the 'Company'), a Massachusetts mutual insurance company, pursuant to and by aNhority of the By-law and
Authorization hereinafter set fonh, does hereby name, constitute antl appoint KEVIN WOJTOWICZ, LINDA J. MEYER, GLENN ARVANITIS,
EILEEN C. HEARD, PETER A. THOMPSON, BRETT ROSENHAUS, MELINDA ROSENHAUS, ALL OF THE CITY OF
CLEARWATER, STATE OF FLORIDA ....................................................................................................................................
each individually if (here be more than one named, its true and Fawlul attorney-in-fad to make, execute, seal, acknowledge and deliver, for and on its behalf as
surer and as its act and deed, an and all undertaken s bonds, recognizances and other surety obli atio to the penal sum not exceeding
TW~NTY•FIVE MILLION ANYD 00/100"""""{""""' DOLLARS ($ 25,000,OOO.UO"~~' )each, and the execution of such
undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents, shall be as binding upon the Company as if they had been
duly signed by the president and attested by the secretary of the Company in their own proper persons.
That This power is made and executed pursuant to and by authority of the following By-law and Authorization
N
G ARTICLE XVI • Execution of Contracts: Section 5. Surety Bonds and Undertakings.
d Any officer or other official of the company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as
Y gj the chairman or the president may prescribe, shall appoint such attorneys-in-fact, as may be necessary to act in behalf of the company to make,
rv execute, seal, acknowledge and deliver as surety any end all undertakings, bonds, recognizances and other surety obligations. Such attorneys-in-
m «' fact, subject to the limitations set fonh in their respective powers of attorney, shall have full power to bind the company by their signature and
u7 eta execution of any such instruments and to attach thereto the seal of the company. When so executed such instruments shall be as binding as if
m signed by the president and attested by the secretary.
3
~ y By the following instrument the chairman or the president has authorized the officer or other official named therein to appoint attorneys-in-tact:
~ ~ Pursuant to Article XVI, Section S of the By-laws, Timothy C. Mulloy, an official of Liberty Mutual Insurance Company, Is hereby authorized to appoint
d ~ such attomeys-in-tact as may be necessary to act in behalf of the company to make, execute, seal, acknowledge and deliver as surety any and all
y 3 undertakings, bonds, recognizances and other surety obligations. All Powers of Attomey attested to or executed by Timothy C. Mulloy in his capacity
- V as an oNicer or otlicial of Libeny Mutual Insurance Company, whether before, on or after the date of this Authorization, including without limitation
~ -y Powers of Attorney attested to or executed as Assistant Secretary of Liberty Mutual Insurance Company, are hereby ratified and approved.
O~
~ ~ That the By-law and the Authorization Set fonh above are true copies thereof and are now in full force and affect.
C ~ IN WITNESS WHEREOF, this Power of Attomey has been subscribed by an authorized officer or official of the Comp ny and the corporate seaal Cf Liberty
a Mutual Insurance Company has been affixed thereto in Plymouth Meeting, Pennsylvania this ~ gth day of re~ruary [0$2
~ ~ LIBERTY MUTUAL INSURANCE COMPANY
~C nn
E ~~; By ~~~~ _ c..~ ,hxY..~
w ~ = Timol~i C. Mullc ssistant Secre ary
COMMONWEALTH OF PENNSYLVANIA ss
v v COUNTY OF MONTGOMERY
On this ~ gth day of February 2002 ,before me, a Notary Public, persohaly came Timothv C. Mullov, to me known, and
acknowledged that he is an otlicial of Liberty Mutual Insurance Company; that he knows the seal of said corporation; and that he executed the above Power of
Attomey and affixed the corporate seal of Liberty Mutual Insurance Company thereto with the authority and at the direction of said corporation.
-----..~
IN TESTIMONY WHEREOF, I tiadahdreunto subscribed my name and afixed my notarial seal at Plymouth Meeting, Pennsylvania, on the day and year first
above written. /,- ~,~t _ _ ___ f
~j--1 ~+~~ ~~-tc,C~~
_~ otary Public
~ / -
CERTIFICATE \` ~~ ~~~. / ~~ ~~~
I, Ne undersigned, Assistant-~relary~ rty Mutual Insurance Company, tlo hereby ceNfy that the orginal power of eaorney of which the foregoing is a full, true antl correct
copy, is in lull force and etlect on Ih£da a of this certificate; and I do further certify that the officer or oXicial who executed the said power of ettomey was one of the officers or officials
specially authorized by Ne chairman or the president to appoint attorneys-in-lent as Drovltletl in Artlde XVI, Sectbn 5 of the ey-laws or LibeM MNual Inswance Company.
his certificate end the above Power of attorney may be signed by facsimile or mechanicaly reproduced signatures under antl by eNhorily of Ne following vote of the board of
rectors of Liberty Mutual Insurance Company at a meeting tluly called antl held on the 12th tlay of March, 1980.
VOTED that the facsimile or mechanically reproduced signature of any assistant secretary or the company, wherever appearing upon a cenilied copy of any power of
attorney issued by the company in connection with surety bonds, shall be valid erW binding upon the company with the same force and effect as Nough manually affixed.
IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seal of the said company, this tlay of ,
~~~_ ='~ n F. X. Hee, Asaislanl Secretary
ACORD CERTIFICATE OF LIABI LITY INSURANCE DATE (MM,DOM1'1)
OS/01/2002
PRODL:Er (561)278-0448 FAX (561)278-2391 THIS CERTIFICATE IS ISSUED ASAMATTER OF INFORMATION
Weekes & Cal l away, Inc. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
P.O. Box 1460 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
Delray Beach, FL 33447-1460
INSURERS AFFORDING COVERAGE
suRED Cata umo Construct on, Lt INSURERA Michigan Mutual Insurance Company
4300 Catalfumo Way INSV+ER B: National Union
Palm Beach Gardens, FL 33410-4248 INSU+ERC:
INSIAtER D:
INSLRER E'
COVERAGES
THE POLICIES OF INSURANCE LISTED BELOW HOVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING
TERM OR CONDRION OF ANV COMRACT OR OTHER DOCUMEM WITH RESPECT TO WHICH THIS CERTIFICATE MAV BE ISSUED OR
ANV REQUIREMENT
,
THE INSURANCE AFFORDED BV THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
MAV PERTAIN
,
POLICIES. AGGREGATE lIM1TS SHOWN MAY HAVE BEEN REDUCED BV PAID CWMS.
LTR TYPE OF NSUUNCE POLICY NUMBER ATE M DATE MM,D LMR9
GENERAL LUBLRY PP332861 01/01/2002 01/01/2003 EACH OCCLRRENCE s 1 OOO OO
X CMWAERCIPL GENERP! LIAa LITy FIRE DPANGE IMy w firs) f lOO, OO
CWMS MODE ^X OCCUR AED E%P (MY a,e OBfsonl S S , OO
A X Blanket Add 1 . PERSONAL d PDV IN.NiY s 1 000 00
Insured GENERAL AGGREGATE s 2,000 00
_
GENL AGGREGATE LIMTAPPLIES PER. PRODUCTS-CONPIOP Pf~G S 2 GOO, OO
POLICY J~ECi LOC
AUT OMOB%.E LMBAfIY 132561 - U3/Ol/2002 Ol/U3/2UU3 COM&NED SINGLE LIMT s
X ANY AUTO IEa sc<iOenU 1,000,00
PLL OWTED AU105 BOOLY INJURY S
SCHEDULED PUiOS IPer Danonl
A
X HREDPUTOS BOpLY INJURY f
X NDNDWNED AlJf05 (Px ecciaeN)
PROPERTY DAAV,GE S
- IPw EcciCaM)
GARAGE LUBILRY AUfO ONLY-EA ACCIDEM S
PNY AUTO OTHER THAN ~~ S
_- AUf00f1Y. AGG S
E%csss LUBnrrv E8719568 01/01/2002 01/01/2003 EACH OCCLaRENCE s 20 000 00
X occLSx ~ cLaMS MSDE AGGREGATE s 20, 000, 00
B f
DEOUCnBLE s
X RETENTION s 30, 00 s
WORKERS COMPENSATION AND 1328612 Ol/Ol/2002 Ol/Ol/2003 X TORY LIMTS ER
EMPLOYERS'LIABILRY EL EACH ACdDEM S SOO OO
A EL d5EA5E-EA ELPLOYEE S SOD, OO
El pSEASE-POLICY LIMT f SOO OO
PP132861 01/01/2002 01/01/2003 Limit: 5100,000
Rented or Leased
A Equipment
DESCRIPTION OF OPERAPONSILOCATIONSIVEMCLESIE%CLUSIONS ADDED BY ENOORSEMEMRPECLLL PROMSIONS
ertificate Holder is listed as Additional Insured
e: Renovation of Village Hall, Village of North Palm Beach, SO1 US Highway 1, North Palm Beach, FL
3408
CERTIFICATE HOLDER ~ X ~ ADORIONAL NSUREO; WSURER LETTER: CANCELLATION
Village of North Palm Beach
501 US Highway 1
North Palm Beach, FL 33408
8HOVLD ANY OF THE
CANCELLED BEFORE THE
E%PIRAmON DATE THEREOF, THE ISSUNC COMPANY PALL ENDEAVOR TO MAIL
~Q_ DAYB VVRRTEN NOTICE TO THE CERTIFICATE MOLDER NAMED TO THE LEFT,
BM FMIktE TO MAIL SUCH NOTICE SHALL NPOSE NO OBLIOATON OR LUIBRRY
of ANY KPm UPON TIC COMPANI'. RS AGEM8 OR REPREBEMATNE3.
IMPORTANT
Ii the certifcate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement
on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may
require an endorsement. A statement on this certificate does not confer rights to the certificate
holder in lieu of such endorsement(s).
DISCLAIMER
The Certificate of Insurance on the reverse side of this form does not constitute a contract between
the issuing insurer(s), authorized representative or producer, and the certifcate holder, nor does it
affirmatively or negatively amend, extgnd or after the coverage afforded by the policies listed thereon.
1x11
u
• SUBCONTACTOR LIST
FOR
VILLAGE HALL RENOVATIONS
VILLAGE OF NORTH PALM BEACH
The following is a complete list of major suppliers and subcontractors to be used 'rf the
undersigned Bidder is awarded the Contract for this Project. Receipt of this document
by the Owner is required before a contract will be executed.
Tvpe of Work Name and Address
CONC.
FORMWORK Catalfumo
CONC. FINISH Catalfumo
CMU SUPPLIER Catalfumo
MASON Catalfumo
CAST STONE
SUPPLIER American Precast
CAST STONE
INSTALLER American Precast
FIN. CARPENTRY Catalfumo
WATERPROOFING Advanced Painting
DOORS & FRAMES Lotsoeich
WINDOW MFG. Arch
WINDOW INSTALL Seminole Glass
GLASS & GLAZING Seminole Glass
LATH & PLASTER Wendell Hall
DRYWALL Catalfumo
• CERAMIC TILE Luciano Looardo Tile
BEA International Village of North Palm Beach
01-0436 Village Hall Renovations
SUB-1
u
FLOORING Sundial
PAINTING Advanced Painting
CASEWORK
AND PANELING A.K. Woodcrafters
PLUMBING Stokes Mechanical
HVAC Bradlev Air Conditionina
HVAC TESTING,
ADJUSTING, AND
BALANCING Bradlev Air Conditionin4
ELECTRICAL Proton
•