June 1979 Page 2 North Palm Beach Land Use Plan (comprehensive summary)TRAFFIC AND CIRCULATION
ELEMENT
This element of the comprehensive plan deals with
the provision of a system of major and collector
roads and streets to serve the travel demands of
present residents. At present, the major roads
serving North Palm Beach are maintained by either
the State Department of Transportation or Palm
Beach County. The responsibility of the village
includes the maintenance and resurfacing of the
collector roads and local streets.
The rapid increase in vehicular travel demands
resulting from surrounding accelerating urbaniza-
tion to the north and west is the primary threat to
maintaining a safe and efficient circulation system.
Usage Characteristics:
According to 1978 traffic counts compiled by the
Area Planning Board, two arterial streets, U.S.1 and
Northlake Blvd., adequately accommodate present
demand. The traffic volume noted on the other
arterial street, Prosperity Farms Road, presently
exceeds its capacity. Although traffic counts are
unavailable for the major collector street, Light-
house Drive, observations indicate frequent heavy
traffic during peak hours.
Administrative Responsibilities:
Responsibility for administering and maintaining
the street system in North Palm Beach is shared
among the state, the county, and the village; con-
sequently, funds for improvement, right-of-way
acquisition and maintenance come from different
sources.
Long -Range Traffic Needs:
The necessity for the immediate widening and up-
grading of State Road Al A (Alt.) followed by the
four-laning of Prosperity Farms Road is justified by
the existing traffic volumes. These improvements
would provide needed relief for U.S. Highway 1,
Northlake Blvd. and the main village collector roads.
With the eventual widening of U.S.1 to six lanes and
the improvement of Alt. Al A and Prosperity Farms
Road, the four laning of Lighthouse Drive would be
forstalled indefinitely; however, alternate routes for
this traffic should be developed. One solution to be
considered is the construction of a bridge at South -
wind Drive and the Earman River, with the resultant
extension of Southwind to connect with Anchorage
Drive.
Plan Recommendations:
A. No major alteration of Northlake Blvd. should be
undertaken, except six laning of the bridge at
South Lake is recommended.
B. No major alteration of Ellison -Wilson Road and
McLaren Road should be undertaken.
C. U.S. Al A Alternate should be improved imme-
diately as a major North-South route to relieve
traffic on Prosperity Farms Road and U.S. High-
way # 1.
CONSERVATION AND COASTAL
ZONE ELEMENTS
Preservation Areas:
There are two areas of major concern within the
village, one is the Marine Grass Beds, and the other
is the Coastal Mangroves. Both of these areas
contribute to the food chain and are, therefore, a
vital habitat for the development of fish. In addition,
these areas serve as a spawning ground for fish,
and provide food and cover for developing fish.
Future use of the barrier islands and the coastal
mainland for development should be consistent
with actions of the Department of Environmental
Regulations and other agencies whose approval is
required prior to development.
Water Storage and Transmission: Storage capa-
city is adequate with combination ground storage
and elevated storage of 7.1 million gallons. The
storage capacity in the North Palm Beach -Lake
Park area is expected to be increased by 2.0 million
gallons within five years.
The distribution system serving North Palm
Beach seems to be adequate with the main trans-
mission lines being continually expanded and
enlarged. Fire service hydrants throughout the
village are installed at 500-600 foot intervals, and
residual pressure ranges from 40 to 60 pounds.
Waste Water System: Collection and Treatment -
The utility is also the owner and operator of the
waste water system serving the village. Sewage is
collected and processed through three treatment
plants with a total capacity of 7,850,000 gallons per
day. The collection system within the village is
considered to be adequate, and the main collectors
are continually being expanded and enlarged.
Effluent is discharged into surface water at present.
Solid Waste:
Solid waste collection within the Village of
North Palm Beach is administered by the Public
Service Department. Solid waste collected by the
village is transferred to the Palm Beach County
Dryer Blvd. Landfill which contains 390 acres in
total land area. The Dryer landfill is expected to
reach full capacity in the year 1995 by conventional
landfill standards.
The Village of North Palm Beach encourages the
implementation of the Palm Beach County Solid
Waste plan under the auspices of the Solid Waste
Authority of Palm Beach County with special
reference to the following:
A. Provide for safe and sanitary collection, proc-
essing, and disposal of solid waste.
B. Provide a coordinated countywide program for
control of solid waste processing in cooperation
with federal, state and local agencies respon-
sible for the prevention, control and abatement
of air, water and land pollution.
C. Require the municipalities and the county to
plan for and develop an adequate solid waste
collection, disposal and resource recovery and
management plan.
D. Encourage the reclaiming of paper by village
residents.
Storm Drainage:
Existing Drainage: The village has a completed
and integrated ground surface percolation and
positive storm water drainage system in all platted
and developed areas. The system in residential
areas consists of grassed roadside swales from
which the surplus water is diverted into closed
conduit systems with outfalls in the man-made
water areas, the Earman River and the Intercoastal
Waterway. Commercial areas, confined to frontage
along U.S. #1 and Northlake Boulevard, have curb
and gutters and positive drainage discharging into
the Earman River and Lake Worth. In addition, all
multi -family areas and commercial districts must
provide designed, on-site retention of all storm
waters by one or more of the following means:
soakage pits (French drains), landscaped area or
diversion -retention basins.
Future Drainage: All future development, whether
residential, multi -family or commercial, will be con-
trolled by existing ordinances in cooperation with
local and state regulatory agencies. There are no
planned drainage improvements anticipated, with
the exception of the maintenance, replacement and
upgrading of existing systems.
5
Conservation Areas:
Flood Protection: The Federal Flood Insurance
Program has been fully adopted and implemented
by the Village of North Palm Beach. Existing regula-
tions set the height of habitable floors and restrict
incompatible sanitary sewer and drainage systems.
In addition, the present building code provides for
construction to withstand hurricane force winds.
Native Vegetation: Protection of the marine grass
land and mangroves is essential in the future
development of the village. Natural resources
should be conserved to produce the maximum
benefits to the village. Cooperation with developers
and coordination with the Palm Beach County
Environmental Control office, Florida Department of
Environmental Regulations and Florida Department
of National Resources along with other local and
state agencies is mandatory for the protection of
the natural resources.
Water Quality:
Storm Water Management Ground water re-
charge and withdrawal must be controlled in order
to maintain fresh water supplies and prevent salt-
water intrusion. The retention of rainwaters on site
allow for percolation through the use of grass
swales, detention and retention basins and prop-
erly designed French drains.
Dredge, Fill and Bulkhead: In order to minimize
water quality problems such as turbidity, bulk -
heading should be limited and the retention of
natural shoreline encouraged in order to absorb
wave action, prevent soil erosion and provide a
habitat for wildlife. Dredging and filling should be
limited in shallow wetland areas in order to maintain
biological productivity.
Aquifer Recharge: Land use patterns should be
promoted which provide minimal impervious cover
in general and allow percolation into the shallow,
non -artesian aquifer.
Regional Issues. Regional issues concern the
coordination and implementation of the feasible
pollution control techniques recommended by the
Palm Beach County Areawide Management Plan
that affect the village. Strong support should be
given to the recommendations of the Palm Beach
Central 201 Facilities Plan to upgrade the Palm
Beach Gardens' waste water treatment facility in
order to hasten the phasing out of the North Palm
Beach facility. Support should also be given to the
efforts of the West Palm Beach Urban Study Area
Metropolitan Planning Organization as well as local
pollution control agencies in the reduction of pollu-
tion resulting from vehicular movement.
SANITARY SEWER, SOLID
WASTE, DRAINAGE AND
POTABLE WATER ELEMENT
Potable Water and Sanitary Sewer:
Service Area: The area to be served by Seacoast
Utilities, Inc., a privately owned corporation whose
service area was granted by the Public Utilities
Commission, extend, generally, from Silver Beach
Road, Riviera Beach to Donald Ross Road.
Water Treatment System: Raw Water Supply -
The existing raw water supply system consists of
41 wells. The rated capacity of the wells is 28.64
million gallons a day with a permitted withdrawal,
granted by the South Florida Water Management
District, of 23.8 million gallons a day.
Water Treatment Plant: The utility processes
water through three water plants with a current
capacity of 26.65 MGD. The ultimate design capa-
city of the three plants is 56 MGD. The treatment
plant capacity is to be increased by 6.0 MGD within
the next 5 years.
UTILITY ELEMENT
The Village of North Palm Beach is served by the
following public utilities: Florida Power and Light
Company, Southern Bell Telephone Company,
Seacoast Utilities and Perry Cable Television. Of
these utilities, special mention is made in the Local
Government Comprehensive Planning Act of the
Ten Year Power Plant Site Plan prepared by the
power company.
Florida Power and Light, a publicly owned utility
subject to regulation of the Florida Public Service
Commission, services the village by feeder lines
coming from two Florida Power and Light sub-
stations. These substations are the Lake Park
substation, located on the southwest corner of U.S.
Highway 1 and Palmetto Road, and the Juno sub-
station, located west of U.S. Highway 1, approxi-
mately 500 feet south of Carolinda Drive.
Land Development and Power Distribution:
The village codes address the placement of plan
facilities and power transmission lines. The place-
ment of transmission facilities and house services
are governed by the subdivision ordinance and
village electric code, which requires that all electric
services be underground.
LEISURE AND OPEN SPACE
ELEMENT
Unlike other parts of South Florida, the expansion
of recreational facilities in North Palm Beach has, in
general, kept pace with the demands for additional
leisure services and facilities through a continuing
master plan. In the village's formative years, the
setting aside of park areas where expansion of a
variety of facilities and activities could be accom-
modated was instrumental in keeping abreast of the
rapid growth of the village.
Plan Recommendations:
Recommendations for leisure services are
derived from an analysis of existing facilities and
programs and the expansion of these facilities and
programs to meet the current and future needs of
the village.
The following are recommendations for facilities,
improvements and programs which should be
carried out under a long range capital improvement
program.
A. Continue to expand facilities at Osborne Park,
Anchorage Park and Alamanda Park in accord-
ance with current master plan.
B. Develop the Anchorage Marina in accordance
with the master plan.
C. Provide funding through the annual budgeting
process for labor and materials to maintain
existing facilities.
D. Expand library cultural programs to include all
ages.
E. Continually plan expansion of all programs with
the aid and recommendation of citizen advisory
boards in an effort to meet the needs generated
by population increase.
F. Continue current five-year capital improvement
program planning for existing facilities through
annual updating.
G. Institute a long-range capital improvement pro
gram for land and facilities to accommodate the
needs and desires of the ultimate population.
H. Continue to require recreational site dedica-
tions for new developments as currently re-
quired by the sub -division ordinance.
t�
F
R.G. ORMAN & COMPANY, INC.
Boca Raton and Riviera Beach, Fla.
BARKER, OSHA, & ANDERSON, INC.
North Palm Beach, Fla.
•4oe98 wlBd 41aoN uo loudw!
alq!6!16au B pey s.1B9/, fuaoa.1 u! Bpuold 4InoS
olul saoB.1 o!u4la jo uo!fe.16!ww! an!ssBW 941 '(uoll
-elndod) a6B11!n a4l jo do-@iIuw ayf ul pa.1ap!suoo
aae 'si!oeIq 'Aue p 'Maj 'abell!n ayf 10 011sualoB
-.1B4o a.1nual IuBu!wop ayf jo pue4 panu!luoo ayf
pup a6ell!n ayf fnoy6noayf bu!sno4 jo A4!I7anb pup
amen uB!paw 46!4 ayf of and :uosi.1edwo0 o/uy13
•sfuap!sa.1 Aliepla jo abelueo
-.1ad Mol Alan!lBlei B sB4 96B11ln ay} '/;Iluanbasuoo
`uaapl!yo eft-ueel jo 96elueoied 46!4 Al6u!puod
-sa.1.1oo pue sluap!sa.1 abs-91pp!w to o!fe.1.1a46!4 B
sey `a6Bp!n pafuauo-�(1!wBj �(I6uo.1Is B 'yoea8 wled
4faoN 'fu9wa1!f91.1oj SUOIIBool anlI0B.1IIB OR 4014M
sa!f!unwwoo Bpuold 4InoS lsow oviun :e5V
:Soils !ae;oeae40 uoi;elndod
0003.1Baf\ aof 46no.14f poludlo!luB
9sB91ou!.1aglnj ou 41!M 0661 Aq 000't�3 of aseaaoul
of peloedxa Si! (9L6 L) 950`9 L jo uoileIndod fuasa.1d
a41 'apeoap 6u!paeoeid eql u! peoua!.1adxe 4lmo.16
p!de.1 panulluoo sapnloaad uo!IBx9uuB.1oj 9IgB1!BAB
spuB1 pal!w!I PUB sl!w!1 96811!^ a4l u!4I!M spuBI
elgBdol9nap a6.1B1 jo �Ioel 941 'Baia IB!fuap!sa.1
AI!wBf a16u!s Alalueu!wopa.1d a se 4IMo.16 p!dej
paouBlBq s,4oBa8 wlBd 41JoN .1ol s!seq eql ueaq
suq sall!uawB lB.1nleu pup puBl jo Iso0 PUB 'A4!1!ge
-11eAB `uo!leool bu!pnlou! s.1oloel to uo!leu!gwoo y
:spue.1l y1nno.10
3JNVHD HIMO80 HOJ SIS`d8
-ueld asn puel
aof of 9ou9.194pe a.1nsu! of .19p.10 ul paluaweldwi
aq Isnw 4o14M suo!luln5a.1 6u!uoz pup samilod
asn pu-el luasa.1d of suo!fB0!l!pow 8so4l i4!luap! 01 sl
>l1omeweil Ajolulnbei aof jo asodind 941 'fuawala
aof u! papnlou! s! � joMawB.1j �(.1olulnbai pasodo.1d
e 'uuld asn puel aof 6u!luawaldwi jo susaw B sy
•luawdolanap a.1nlnl Ile bu!pae69.1 6u1� ew-wo!s!oop
alBn!.1d pup o!Ignd ap!n6 of aq ll!M a6Bll!A aof
1^046^0.14I sasn puel jo �(l!sualu! pup uo!lnqufs!p
pa.1nsep a.1nlnl a4l sequosep 4o!4M sfuawala uBld
94110 lonpo.1d leu!l a41 'p9z!IB9J aq f\Bw sasn puel
jo sadlq aleudo.1dde a.1ow .1oj sa!l!unl.1oddo a.1a4M
sBaxe se 119 M. sB a0u9p!n9 u, 9.1B slo!ljuoo a.1nlnl.10
lueseAd a.1a4M sB9.1B 1,j!fuap! of 9n.1as sa!o!Iod asn
puB1 `senss! ap!M-96$11!^ of uo!I!ppB ul 'pa.1alleun
j! sasn puel a.1nlnj au!w.1alap 1l!M 4o!4M Pup u.1allBd
asn puel luesa.1d a4l of pelnquluoo 4o!4M spud11
fuawdolanap aof to a6pelMouA B wo.1l p9nt.1ap
a.1B salo!lod asn puB '96B11!n 94I Ino46no.14f
luawdolanap a.1nlnl op!n6 of sa!ollod asn puel
4s!igelse of si sluawala ueld a41 jo asodind a41
S1N3W313 NVId
'sB9.1B uo!IBa.1o9.1 f\I!wB1
punoxe pa.1alsnlo 6u!sno4 [\I!wBl-al6u!s jo sail
-!suap alB.1apow oI Mol bume4 sluawdolanap I!un
pauueld se pazualoe e4o aq pinoM Iuawdolanap
a.1nfn1`p90.1ojua a.1B sa!o!lod asn puB1 pasodo.1d ll
6u1){Bw-uo1s1oap Aep-of-ALP
u! ap!n6 B se pasn pup pal.1oddns �Clan!IoB aq Isnw I!
4ons sV 'aj!1 jo �(l!IBnb eql u! sluawano.1dw! pa.1!sap
jo uo!lez!Ieei aof .1ol fool B s! veld 9n!su94aidwoo
941 uBld eqj jo san!loafgo 941 ana!4oB of Alan!I
-B.1ad000 �{.1oM Isnw slB!oljlo o!Ignd pup suez!l!o
-uo!ldope weld
bu!Mo1lol I96pnq pup wB.16o.1d luawano.1dw! IBl!deo
B u!4l!M slu9wano.1dw! a.1nlon.1lseilul alnpegos
puB az!luoud of fuessooau aq 1l!M I! 'slu9w9no.1d
-w! papaeu jo uo!leldwoo �1.1ap.10 a4l .1oj ap!no.1d
of.1ap.10 ul •spunj oilgnd jo asn eql.1ol suo!lepuaw
-wooer aMew Isnw 'sa!l!1pul ollgnd of slu9wano.1dw!
.1oj peau builenlBna u! 'weld 9n!suaga.1dwoo 941
•pa.1!nba.1 aq
II!M suo!s!na.1 '6u!uoz luesa.1d pus fuawale asn pull
eql uaaMleq Is!xe slo!Ijuoo 9.194M `.19n9MoH dew
6UIUOZ B fou s! luawala asn puBI 941 '4oB9e wlad
1_11.1'10N jo 95ell!A ayf 1no46no.14f sasn puel snouBn
jo sa!f!suafu!
PUB sada l papuaful ayf salBo!pui
fuawala asn puel a41 'pa.1lnbei aq II!M suo!loe
o1poods u!el.1ao 'ueld ayf fuawaldw! of .19p.10 ul
weaboad laf!deo ayf pue sluawala ueld bulfepdn
Pup bUISlna.1 pup ueld ayf 10 SI09110 6111Jol!uow
'luawanlonu! uez!l!o bu!nu!luoo.1ol peau a seleo!pu!
s!41 •salluoud pue spaau IBool pue suo!l!puoo
6u!6uB40 of asuods9.1 u! uo!lunlBn99.1 6u!nulluoo
of loafgns aq Isnw 9.1o1aia4f 'ueld 941 'ssaoo.1d
6u!o6uo pup bu!nu!luoo a ss papuafu! s! wea6oad
6u!uueld ayf '.1anamOH „'joa.1941 suo!I.1od.10 sluaw
-a19 .10 ueld an!suaya.idwoo ayf 4I!M [\f!w.1ojuoo
ui ldeoxe pafl!iwad eq Ileys fuawdolanap 0lBn!.1d
.10 opgnd ou„ fayf pus snIels IB691 aney Ileus ueld
an!sua4a.1dwoo ayf lu4f sa.1!nba.1 foe alels 941
wo!lelueuieldwl
sluawano.1dw! lef!dao .1oj sa!luoud las pup ap!n6
II!m pup wwbo.1d fu9w9no.1dw! lel!dao a4l awooeq
II!M ls!I spaau lel!duo pal a4l weld an!sua4a.1d
-woo aof jo uo!ldope 94f bu!Mollod 9n!IBIa.1
pup ao.1nos 6u!punl lsoo jo sw.1al u! ljsls 96$11!^
f\q palunlBna aq 1l!m ueld a4l f%q pepuawwoo9.1
slu9wano.1dw! lul!duo aso41 'ls!1 spaau lel!duo B
jo uoiluxedeid 94f 4l!M suibeq A4!l!q!s7a91 o!wouooa
bu!u!w.19lap.1ol sseoo.1d a41'palB0!pu! aq sao.1nos
bu!punj Ieilualod lB4l pulealq!seel A11B01wouo0a aq
suo1,lBpuawwoo9.1 11B IB4l sa.1!nbei loe 81131s 941
:fqiligiseed o!wou033
-uBld aof ul ls9.1alu! Pup lua1Uwo0
o!lgnd l!o!los oI palnqufs!p Xlap!m 9q II!M ueld fuuw
-wns s!41 'uo!l!ppB ul 'suo!lBpuewwooei ueld .1ol
s!seq a4l fuawnoop slB1.191Bw o!4dB.16 6wl.1oddns
pup l.1oda.1 IBo!u4o9I V 'pa.1Bdaid a.1aM sfuawala
uBld 11eip puB `sa!luoud Ieool 109118.1 of p94!pow
oil am se!l!unl.1oddo pup swalgo.1d jo sluawalBls e4l
�(ouabu bu!uueld leool eql Aq pa.1osuods sdogsilaom
o!Ignd jo sa!.1as B .1afjy 'sa!l!unlioddo puleswal
-go.1d luool bu!zuewwns s.1aded bui�poM paluesa.1d
sfuBflnsuoo sdBw aseq jo uo!lu eda.1d PUB Blep
fuen919.1 eql jo i(.ioluanu! IB!f!u! 194l 6u!Mollod 'sluaw
-ala vold 6uueda.1d .1oj s!sBq aof sB spBa4 fuaw
-pedap pup uo!ss!wwoo bu!uueld 's1B101,40 a6B11!n
wo.1j lndu! jo bu!z� lBule Pup 6u!.1a41eb aof sem
uuld eql jo uo!fB.1Bdaid a4l u! dals 1\9� V 'suo!l!puoo
IBool jo [\pnls 9n!suafx9 uB jo llnsa.1 a4l s, uleld
an!suegeAdwoo 4oBa8 wlBd 4I.1oN 10 a6Bll!A 941
:4oeoiddd
uo!IBu!p.1oo0 IBlu9wu.1ano6.1alul •
sawmin •
ielBM algelod
puB abeu!B.1Q 'alsBM p!IoS .1amaS fuBI!ueS •
uo!lBlno.1!o pup 0!ljB.1l •
aoBdS' uad0 pup a.1ns!a-1 •
asn PUB -1 •
uo!lBn.1asuoo •
6u!snoH •
:6u!Molloj eql epnlou! 'iGBwwns
s!4I u! paluesa.1d a.1B 4o!4M puB `loe eql Aq pa.1!nbei
sfuawala uBld 941 „'a1q!seaj �lleolwou000 aq 11B4s
uBld aof PUB lualslsuoo aq I1B4s uBld an!sua4a.1d
-woo a4l jo sluawala IB.1anas a4I jo uo!lBu!p.1000
Ba.1B eqI jo Iuawdolanap IBos! j PUB I8fu9wuo.1!nua
'leo!sA4d 1B1oos olwouooe a.1nlnl paouBlBq pup
A1.1ap.10 a4l.1oj sp.1epuels PUB s9u!lap!n6 'sald!ouud
jo Is!suoo IIB4s uBld an!sua4a.1dwoo 941„ `IoB
941 of bu!p.1000V 'Af!IBd!o!unw aql jo Iuawdolanap
a.1nlnl of ap!n6 IB!o!jjo uB ap!no.1d of si uBld anis
-ua49.1dwo0 eql jo asodind 941 '6L6L `L f%Inr Aq
uBld an!sua49.1dwo0 a IdopB pup aieda.1d sa!I!lud
-!o!unw IB4I sa.1!nbei gL6 L 10 IoV 6u!uuBld an!su94
-a.1dwoo luawu.19noo IBoog Bpuold jo 91BIS a41
:018PUBW ayl
318WV3ad
VILLAGE OF
NORTH PALM BEACH
COMPREHENSIVE PLAN
SUMMARY
JUNE - 1979
6L6Launr
d3`d1S 'O'd'`d
-Idea eoueui140sla4 pleuoa
Aaeagi-7 1!->{s.1ogeZ apper
Ide(7 uoileaaoed '.1ogel nlS
/f4eles oilgnd `.1alemlV u40f
)halo e5elli^ 'JONIBM sa.1019(1
saoiAaag oygnd 'e!ll9M0 'U'O
:SGV3H 1N3NiHVd3G 30V -1 -IIA
asod Uee
s.1apu3 f66ad
geM4oS pleuoa
ueilla.1l sel5nod
ie� oo.10 uoa
:SH38W31IN SnOIA38d
6u!unnoa 96.1090
lezl!1 sawep
alepsuo-1 sawep
aolad pleuoa
Noe18 we1111M
uewaiey0 eoin `pAold p.1ennoH
uewaiey0 'l\zweH ydesop
:A0N30`d ONINMd_Id _1V00-1
.1a5eueyv e5ell!A 'IssV 'puelnnoH Rea
1118100!N .f, Ined
:83E)VNVIN 30V-1-1IA
uewliouno0 `s�{.1eIN YA
uewyouno0 `a.1oo!nj IV
wal odd 'sand -9A -1 (sled
JOAe141 a0►A '.1!wzey{ 'p pleuoa
.1o�(elN `Um0.19 'H we1111M
-11ONn00 30V -1-11A
Slla3aa
Household Organization: In 1970, there were
approximately 1,226 single family units and 1,967
multi -family units within the village producing an
average household size of 2.90. This trend pre-
vailed through 1978 and should rise moderately
through 1990 to build a strongly family orientated
village. These factors are reinforced by the low
percentage of families with female heads and the
high percentage of individuals in families indicates
no socio-economic problems.
Income Distribution: The most recent income data
available for the village dates from a 1974 census
estimate of per capita income in the county's
municipalities. It showed the village per capita
income was $8,578 as compared to the County
mean of $6,182. Few, if any, individuals are on
public assistance, not including social security, and
no families are considered below the poverty level.
Neighborhood Profiles. There has been no record
of any sub -standard dwellings in the village which
attests to the fact that the village has no socio -
economical problems. This is attributed to the strict
enforcement of the Village Code of Ordinances, the
Standard Building Code with amendments, the
utilization of the Standard Housing Code and the
F.H.A. Housing Code Inspection Program.
Goals and Objectives:
In order to develop comprehensive plan elements
which are directed toward meeting local needs and
desires it is necessary to state expicitly those goals
and objectives which are inherent in the plan. Goals
are statements of ideals toward which communities
strive. Objectives are more specific assignments
directed toward achieving goals.
A. Housing and Neighborhood
GOAL: To provide safe, sanitary, affordable and
otherwise adequate housing satisfying the
needs of the residents of North Palm Beach.
OBJECTIVE:
1. To promote quality housing throughout the
community by the maintenance of existing
dwellings and to assure that quality is main-
tained in new construction.
2. To offer diversification of housing types to all
segments of the village population.
3. To encourage residential development that
complements the objectives of community
facilities and services.
B. Conservation and Coastal Zone Protection
GOAL: To provide a high quality natural en-
vironment where natural resources are con-
served and used to produce the maximum
benefits to the village.
OBJECTIVE:
1. To protect natural resources from degrada-
tion by future development.
2. To beautify or enhance the natural environ-
ment in North Palm Beach.
3. To maintain a level or air quality which, as a
minimum, complies with federal, state and
regional pollution control standards.
4. To encourage the management of ground
water recharge and withdrawal to maintain
fresh water supplies and prevent saltwater
intrusion.
5. To prevent the loss of human lives and
minimize property damage caused by floods.
6. To administer land use regulations to main-
tain a high quality natural environment.
C. Land Use
GOAL: North Palm Beach is and desires to
remain a residential community offering a full
GOAL: To provide an adequate and economical
waste water system to all areas within the
village limits with concern for its resulting opera-
tional impact on the environment.
OBJECTIVE:
1. To provide a responsive and cost effective
waste water system.
2. To prevent degradation of natural resources
and the environment by the operational pro-
cedures of the waste water system.
GOAL: To provide adequate drainage systems,
with sufficient capacity and acceptable quality
and quantity of discharge throughout the village.
OBJECTIVE:
1. To maintain the existing storm drainage
system at its present level of operation.
2. To protect water quality.
3. To encourage the management of ground-
water recharge and withdrawal in order to
maintain the fresh water supplies and pre-
vent saltwater intrusion.
4. To prevent the loss of human lives and
minimize property damage caused byfloods.
GOAL To provide adequate and efficient solid
waste services and facilities meeting the needs
of the population and providing for their health,
safety and general welfare.
OBJECTIVE:
1. To provide a responsive and cost effective
solid waste system.
2. To maintain a collection service that best
serves the residents of North Palm Beach.
LAND USE ELEMENT
Existing Land Use:
The distribution of land uses in the Village of North
Palm Beach reflects two development factors
unique to South Florida's environmental quality and
climate. The two are the primary catlyst for the rapid
but controlled growth of the area. Consequently,
residential uses represent the largest single cate-
gory of land use. At present, approximately 38.5% of
the total land area exists in residential use, nearly
90% of the developed area. Single family and multi-
family development has generally followed the
plans developed by the original developer.
At present, nearly 47.6% of the land area in North
Palm Beach is zoned for residential use. Of this total
area, only 9.1% is available for development.
Demand for new residential development will likely
remain high in the future due to continued rapid
immigration and desires of the community to remain
a predominantly (affluent) residential area.
The pattern of commercial land use in North Palm
Beach is similar to other communities located along
the coastal ridge wherein commercial development
has gravitated to the two main arteries within the
village and has characteristically established two
distinct commercial areas. Future commercial
development is limited to approximately 1.75% of
the 5.1 % acres zoned commercial.
Future Land Use:
For the purpose of estimating the future amount
of traffic generated in North Palm Beach, an analy-
sis and projection of a growth policies plan has
been constructed. The resulting data are used to
establish a localized transportation plan to deal
with the movement of goods and people and a
system improvement commensurate with the future
land use plan, thus predicting with some reliability
what the future use of the land in North Palm Beach
will be.
K,
range of municipal services, a diversity of
housing choice, commercial development suffi-
cient to satisfy the needs of the resident popula-
tion, and a choice of recreational opportunities.
Industrial development is not desired. The en-
vironment of North Palm Beach has been
enhanced through planning and responsible
municipal management. These principles will
continue to guide village growth.
OBJECTIVE: To continue all development as
embodied by the present zoning ordinance
without substantial alteration.
D. Recreation and Open Space
GOAL: Maintain and improve existing facilities
and programs and add new facilities and pro-
grams as future needs dictate.
OBJECTIVE:
1. To complete existing facilities in accord-
ance with currently approved master plans.
2. To complete planning programs of all exist-
ing, partially developed facilities.
3. To continue the high level of maintenance at
all existing facilities.
4. To expand leisure programs to meet current
and future needs.
5. To plan fora long-range capital improvement
program for facilities.
E. Traffic and Circulation
GOAL: The efficient movement of traffic to, from,
through, and within the corporate limits and the
surrounding area.
OBJECTIVE:
1. To continue current high level of mainte-
nance.
2. To insure adequate traffic circulation and
access to new developments.
3. To insure arterial streets are continually
improved.
4. To seek adequate public transportation
systems.
F. Utilities, Potable Water, Sanitary Sewer, Drain-
age, Solid Waste
GOAL: This element shall be consistent with the
current 10 year site plan submitted by the
electric utility serving the village pursuant to the
State Comprehensive Planning Act (Section
163.3177), Florida Statutes and Section 23.019,
Florida Statutes).
OBJECTIVE:
1. To be consistent with the requirement that
this power element conform to Florida
Power and Light (FPL) 10 year site plan, the
projections and proposals of that plan as it is
amended from time to time by FPL and found
to be suitable by the Division of State Plan-
ning are adopted by reference and made a
part of this comprehensive plan.
2. To recognize the legal requirement of FPLto
provide electrical power to customers in its
service area in decisions regarding the need
for the proposed location of future electric
power facilities.
3. To consider the economic costs of providing
electrical service to the residents of North
Palm Beach in planning for development.
4. To coordinate with FPL to ensure that the
future energy needs of the village will be met
as they arise.
GOAL: To provide an adequate and economical
water supply system to all areas within the
village limits.
OJBECTIVE: To provide a responsive and cost
effective water supply system.
Land Use Plan Policies:
In effect, the use plan is a graphic policy state-
ment relating to the physical structure and con-
figuration of the village. It delineates the desired
use of specific parcels of land within the corporate
limits and the relationship of that use to other land
uses and support services within and adjacent to
the Village.
From this, asix-district land use classification is
developed:
A. Residential Use:
1. Low density single family detached resi-
dences, not to exceed four units per acre.
2. High density residential single-family, two-
family and multi -family, not to exceed twenty
units per acre.
3. Medium density residential single family and
two family residences, not exceeding a
density of eleven units per acre.
B. Commercial Use:
1. Land use devoted to the sale or transfer of
goods on a retail basis. Personal services
and office activities are also included in this
category. Industrial uses, i.e., those uses
involving the manufacture, fabrication or
other conversion of raw materials to usable
products are not included.
2. Public or institutional uses which generally
exist for the benefit of the public and not
engaged in gainful business.
3.Parks and Open Space, land permanently
committed as open area generally providing
leisure time and recreational needs.
HOUSING ELEMENT
Summary:
The future economic, social and physical attrac-
tiveness of North Palm Beach shall be as it has been
maintained in the past: by the quality of construction
and the high median value of single family resi-
dences. From a village -wide perspective, housing
in North Palm Beach is in excellent condition with no
substandard dwelling units within the village limits.
Housing Supply:
The largest proportion of dwellings in North Palm
Beach continues to be multi -family dwellings which
represent approximately 61.6% of the total units.
The proportion of single family dwellings, repre-
senting 38.4% of the total, is consistent with the
county -wide mix of 40%.
Housing Costs:
Following the national trend, housing costs in the
village have increased significantly since 1970,
rising 140% in eight years. This represents the
highest increase in housing values in the county.
Construction Activities:
From 1970 to 1978, permits were issued for over
2176 new dwelling units in North Palm Beach - an
increase of 60% for the eight year period.
Housing Demand:
Future housing demand will remain strong for the
next decade. It can be expected that single family
residences, representing home ownership, will be
dominant. Multi -family demand, although remain-
ing high in this period, will diminish within the village
due to the unavailability of developable land.