1976-16 Award Bid to Simgo
RESOLUTION N0. 16-76
A RESOLUTION OF THE VILLAGE COUNCIL OF NORTH PALM BEACH,
FLORIDA, ACCEPTING THE BID OF SIMGO CORPORATION FOR TWO TENNIS COURTS -
NORTH PAIM BEACH COUNTRY CLUB IN THE AMOUNT OF $21,100.00 FROM ACCOUNT
' N0. 15-404.5
BE IT RESOLVED BY THE VILLAGE COUNCIL OF NORTH PALM BEAC}{~
FLORIDA:
Section 1. The bid of Simgo Corporation, copy of which is
attached to this Resolution, is hereby accepted by the Village of North
Palm Beach in accordance with its terms. The appropriate Village officials
are hereby directed to advise said bidder of this acceptance. The monies
are to be expended from Account No. 15-404.5.
Section 2. This Resolution shall take effect immediately
upon passage.
PASSED AND ADOPTED THIS 25 DAY OF MARCH, 1976.
1
/s/ Ronald L. Herat
MAYOR
ATTEST:
/s/ Dolores R. Walker
Village Clerk
1
75-273 BIDDER:__ .S~M(n0 CORr'b2flT~-.)
PROJECT: PROPOSED ADDITION TO TENNIS COURT
FACILITIES AT THE VILLAGE OF NORTH
PALM $EACH COUNTRY CLUB, PALM BEACH
COUNTY, FLORIDA
DATE: MR12S}{ ~~7---~ ~ ~ ~
BID FO~.M
TO: Paul J. Nicoletti, Village Manager
Village Hall, U.S. Highway # 1
North Palm Beach, Florida
Gentlemen:
The Bidder, pursuattt to your Invitation for Bids for
Having examined the brawings an Spec cat ons w t re ate ocuments
and the site of the proposed Work, attd being familiar with all of the
conditions surrounding the .construction of the proposed Project, in-
cluding the availability of materials and labor, hereby proposes to
furnish all labor, materials, supplies, services, etc. necessary to
construct the Project in accordance with the Contract Documents,
within the time set forth herein, and at the prices stated below.
These prices shall cover all expenses incurred in perforning the
Work required under the Contract Documents of which this proposal is
a part.
item Un t
No. Item Quantity Unit Price Amount
NEW COURTS
1. Site Preparation & Earth-
work and Tennis Court
Construction Lump Sum
2. Tennis Court Surface (100$
Acrylic Color System) Lump Sum
s .raga. -'
Continued...
MOCK, RODS & SEARCY, INC.
CONSULTING ENr,INEER5
BF-1
75-273
Item
No.
Item Quantity
Unit Unit
Price Amount
3. Tennis Court Lighting(includes
all electrical work & trenching
and backfill for conduit) Lump Sum $ y 9 $Q. ^
4. Fencing Work Complete Lump Sum $ 3 / 3Zl. r'
FOUR EXISTING SOUTH COURTS
5. Resurfacing of Four Existing
South Tennis Courts includes
surface preparation s 1008
Acrylic Color System Surface) Lump Sum $ t/~'pQ, ~
NOTE: Owner reserves right to award the above Items of Work to
one or more Contractors. If only one Contract is awarded
by Owner for all the above Items of Work, Bidder shall do
all the Work for the Lump Sum amount of $ ~(, (p~j_~+
(.include costs savings, if any, to Owner over &bove prices
for one Contract being awarded to one Contractor for entire
Project).
BIDDERS MAY BID ALL OR ANY PORTION OF THE ABOVE WORK
Continued...
MOCK, ROOS 6 SEARCY, INC.
CONSULTING ENGINEERS
BF- 2
75-273
The Bidder, if awarded the Contract, agrees to start the Work within
calendar days after the Proceed date the Owner designates
in t e wr tten Notice to Proceed and guarantees completion of the
Project within ~p _calendar days after the designated Proceed
date set by the Owner.
Bidder further agrees to pay as liquidated damages, the sum of $50.00
for each consecutive calendar day thereafter as provided in paragrap
3 of the SUPPLEMENTARY CONDITIONS Section.
If Owner's Notice of Award of this bid is mailed, telegraphed, or
delivered to the Bidder, within Sixty (60) days after the
date of opening of Bids, or at any time thereafter before the Bid
is withdrawn, the Bidder agrees that he shall execute and deliver a
Contract in the form attached as required by the Contract bocuments,
in accordance with the Bid as accepted, and that he shall furnish
the required Contract Security within fifteen (15) days of the
Notice of Award.
The Bidder declares that he understands that the unit quantities
shown on the estimates are approximate only and are subject to either
increase or decrease; and that should the quantities of any of the
items of Work be increased, the Bidder proposes to do the additional
work at the unit prices set out herein, and should the quantities be
decreased, he also understands that payment shall be made on actual
quantities installed at the unit prices, and shall make no claims
for anticipated profits for any decrease in the quantities. Final
quantities installed shall be determined by the Engineer upon com-
pletion of the Work..
The Bidder further declares that he understands that the Owner may
elect to construct only a portion of the Work covered by these
Documents and agrees that he shall perform that portion of the Work
for which he is awarded a Contract at the. prices quoted herein.
Enclosed is Bid security required in the sum of .~
w c s al ecome t o property o t e Owner m e event t o Agree'
ment and Bond are not executed within the time above set forth, as
liquidated damages for the delay and additional expense to the Owner
caused thereby.
Bidder acknowledges receipt of the following addenda (enter numbers):
Notice of Award should be maildd, telegraphed or delivered to the
undersigned at the pidder's Business Address noted by the Bidder at
the end of this document.
Continued...
MOCf„ RODS ~ SEARCY, INC.
CONSULTING ENGINEERS
BF-3
1'
75-273
The submission of this Bid constitutes an incontrovertible representa-
tion by the Bidder that he has complied with every requirement of
Article 3 of the INSTRUCTIONS mn nThhFnc
The Bidder hereto has executed this Bid the day and year first above
written.
(~n'ature)
If Bid is by a Corporation:
State of Incorporation
~f_tT' C_ H i l l ct° tfli?£ tv~tti~T'
(Typed or Pr rated Name 6 T tile)`
S~~.bo COR1wVlMTtC~
-- .ZYoa C~ G n t?wtt. r ,an,.
FL oR ~ i~!}
~ Business Address -~ p-~Co~e)
r t ~ ~ y t
or
NOTE: See Article 8 of the INSTRUCTIONS TO BIDDERS for ihstructions
regarding the proper execution of t s orm.
MOCK, RODS & SEARCY, INC.
CONSULTING ENGINEERS
BF-q