2017-62 Professional Services Contract for Anchorage Park Phase 2 Master PlanRESOLUTION 2017-62
A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF
NORTH PALM BEACH, FLORIDA APPROVING A CONTRACT AWARD
TO CALVIN, GIORDANO & ASSOCIATES, INC. FOR DESIGN AND
CONSTRUCTION DOCUMENT PREPARATION SERVICES RELATING TO
THE ANCHORAGE PARK MASTER PLAN PURSUANT TO PRICING
ESTABLISHED IN AN EXISTING CONTRACT FOR PROFESSIONAL
SERVICES WITH THE TOWN OF JUPITER AND AUTHORIZING THE
MAYOR AND VILLAGE CLERK TO EXECUTE THE CONTRACT; AND
PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, in furtherance of its grant awards and applications, the Village wishes to proceed
with the creation of the Anchorage Park Phase 2 Master Plan and related construction plans; and
WHEREAS, Village Administration recommends that a contract be awarded to Calvin, Giordano &
Associates, Inc. pursuant to pricing established in an existing contract for professional services
with the Town of Jupiter (Contract No. EPW 2016-12B); and
WHEREAS, the Village Council determines that the adoption of this Resolution is in the best
interests of the citizens and residents of the Village of North Palm Beach.
NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE COUNCIL OF THE VILLAGE
OF NORTH PALM BEACH, FLORIDA as follows:
Section 1. The foregoing recitals are ratified as true and incorporated herein.
Section 2. The Village Council hereby approves a Contract with Calvin Giordano &
Associates, Inc. for the creation of the Anchorage Park Phase 2 Master Plan and related
construction plans pursuant to pricing established in an existing contract for professional services
with the Town of Jupiter (Contract No. EPW 2016-1213) and authorizes the Mayor and Village Clerk
to execute the Contract on behalf of the Village, a copy of which is attached hereto and
incorporated herein. The total cost of this Contract shall not exceed $41,350.85, with funds
expended from Account No. U8028-66210 (Parks and Recreation — Anchorage Park).
Section 3. This Resolution shall take effect immediately upon adoption.
PASSED AND ADOPTED THIS 24TH DAY OF AUGUST, 2017.
(Village Sell)
MA OR
ATTEST:
VILLAGE CLERK
CONTRACT
This Contract is made as of this day of GEST , 2017, by and between the
VILLAGE OF NORTH PALM BEACH, 501 U.S. Highway One, North Palm Beach, Florida
33408, a Florida municipal corporation (hereinafter "VILLAGE"), and CALVIN, GIORDANO
& ASSOCIATES, INC., 1800 Eller Drive, Suite 600, Fort Lauderdale, FL 33316, a Florida
corporation (hereinafter "CONSULTANT"), whose F.E.I. Number is 65-0013869.
RECITALS
WHEREAS, the VILLAGE is in need of professional services relating to Anchorage Park,
including the creation of a Master Plan and construction documents necessary to implement
grant -funded park improvements; and
WHEREAS, the Town of Jupiter, through its competitive selection process, awarded a
continuing contract for profession services (Contract No. EPW 2106-12B) ("Jupiter Contract") to
CONSULTANT; and
WHEREAS, the VILLAGE requested that the CONSULTANT provide design and construction
document preparation services based on the pricing established in the Jupiter Contract; and
WHEREAS, as authorized by the VILLAGE's purchasing policies and procedures, the
VILLAGE desires to retain CONSULTANT's services by "piggy -backing" the Jupiter Contract,
including all terms, conditions and pricing set forth therein.
NOW THEREFORE, in consideration of the mutual promises set forth herein, the receipt and
sufficiency of which are hereby acknowledged, the parties hereto agree as follows:
1. Recitals. The parties agree that the recitals set forth above are true and correct and are
fully incorporated herein by reference.
2. Jupiter Contract. The Town of Jupiter's continuing contract for professional services
(EPW 2016-12B) with CONSULTANT, attached hereto as Exhibit "A," is incorporated herein
by reference.
3. CONSULTANT's Services and Time of Completion.
A. In accordance with the terms and conditions of the Jupiter Contract and at the direction of
the VILLAGE, CONSULTANT shall perform professional services in accordance with its
Proposal, a copy of which is attached hereto as Exhibit `B" and incorporated herein by reference.
B. The total cost of such services shall not exceed $41,350.85.
C. The services to be provided by CONSULTANT shall be commenced subsequent to the
execution and approval of this Contract by the VILLAGE and upon written notice from the
VILLAGE to CONSULTANT to proceed.
Page 1 of 5
4. Conflict of Terms and Conditions. Conflicts between documents shall be resolved in the
following order of precedence:
A. This Contract
B. Exhibit "A" (Jupiter Contract)
C. Exhibit `B" (CONSULTANT's Proposal)
5. Compensation to CONSULTANT. Payments by the VILLAGE to CONSULTANT
under this Contract shall not exceed the amount of compensation stated in Section 3(B) above
without prior written consent of the VILLAGE. CONSULTANT shall submit invoices to the
VILLAGE for review and approval by the VILLAGE's representative, indicating that goods and
services have been provided and rendered in conformity with this Contract, and they then will be
sent to the Finance Department for payment. Invoices will normally be paid within thirty (30)
days following the VILLAGE representative's approval. CONSULTANT waives consequential
or incidental damages for claims, disputes or other matters in question arising out of or relating
to this Contract. In order for both parties herein to close their books and records,
CONSULTANT will clearly state "final invoice" on CONSULTANT's final/last billing to the
VILLAGE. This certifies that all goods and services have been properly performed and all
charges have been invoiced to the VILLAGE. Since this account will thereupon be closed, any
and other further charges if not properly included in this final invoice are waived by
CONSULTANT. The VILLAGE will not be liable for any invoice from CONSULTANT
submitted thirty (30) days after the provision of all goods and services.
6. Period and Renewals. This Contract shall be for the term as indicated in the JUPITER
Contract. Extensions or renewals to the JUPITER Contract or any modification including new
products, terms, or price changes to the JUPITER Contract shall be submitted by
CONSULTANT to the VILLAGE for approval. In the event the JUPITER Contract expires and
no new contract is let by the JUPITER, VILLAGE reserves the right, upon written agreement
with CONSULTANT to renew this Contract under the same terms and conditions for an
additional period of one (1) year.
7. Insurance. CONSULTANT shall obtain and maintain during the term of this Contract all
insurance required under the JUPITER Contract, with the VILLAGE named as an additional
insured.
8. Indemnification.
A. To the fullest extent permitted by applicable laws and regulations, CONSULTANT shall
indemnify and save harmless and defend the VILLAGE, its officials, agents, servants, and
employees from and against any and all claims, liability, losses, and/or causes of action arising
out of or in any way related to the services furnished by CONSULTANT pursuant to this
Contract, including, but not limited to, those caused by or arising out of any act, omission,
negligence or default of CONSULTANT and/or its subconsultants, agents, servants or
employees.
B. CONSULTANT shall not be required to indemnify the VILLAGE, its officials, agents,
servants and employees when the occurrence results solely from the wrongful acts or omissions
Page 2 of 5
of the VILLAGE, its officials, agents, servants and employees. The terms of this Section shall
survive completion of all services, obligations and duties provided for in this Contract as well as
the termination of this Agreement for any reason.
C. Nothing contained in this Contract shall create a contractual relationship with or a cause
of action in favor of a third party against either the VILLAGE or CONSULTANT, nor shall this
Contract be construed a waiver of sovereign immunity beyond the limited waiver provided in
§768.28, Florida Statutes.
9. Compliance with all Laws, Regulations and Ordinances. In performing the services
contemplated by this Contract, CONSULTANT shall obtain all required permits (if any) and
comply with all applicable federal, state and local laws, regulations and ordinances, including,
but by no means limited to, all requirements of the Village Code and the Florida Building Code.
10. Warranty/Guaranty. Unless a longer period is stated in the JUPITER Contract,
CONSULTANT warrants that its goods and services provided under this Contract will be free of
defects in materials and workmanship for a period of one (1) year following delivery and
completion of those goods and services.
11. Access/Audits. CONSULTANT shall maintain adequate records to justify all charges,
expenses, and costs incurred in estimating and performing services pursuant to this Contract for
at least five (5) years after termination of this Contract. The VILLAGE shall have access to such
books, records, and documents as required in this section for the purpose of inspection or audit
during normal business hours, at CONSULTANT's place of business. Under no circumstances
will CONSULTANT be required to disclose any confidential or proprietary information
regarding its products and service costs.
12. Miscellaneous Provisions.
A. Failure of a party to enforce or exercise any of its right(s) under this Contract shall not be
deemed a waiver of that parties' right to enforce or exercise said right(s) at any time thereafter.
B. This Contract shall be governed by the laws of the State of Florida. Any and all legal
action necessary to enforce the Contract will be held in Palm Beach County. No remedy herein
conferred upon any party is intended to be exclusive of any other remedy, and each and every
such remedy shall be cumulative and shall be in addition to every other remedy given hereunder
or now or hereafter existing at law or in equity or by statute or otherwise. No single or partial
exercise by any party of any right, power, or remedy hereunder shall preclude any other or
further exercise thereof.
C. If any legal action or other proceeding is brought for the enforcement of this Contract, or
because of an alleged dispute, breach, default or misrepresentation in connection with any
provisions of this Contract, the successful or prevailing party or parties shall be entitled to
recover reasonable attorney's fees, court costs and all expenses (including taxes) even if not
taxable as court awarded costs (including, without limitation, all such fees, costs and expenses
incident to appeals), incurred in that action or proceeding, in addition to any other relief to which
such party or parties may be entitled.
Page 3 of 5
D. If any term or provision of this Contract, or the application thereof to any person or
circumstances shall, to any extent, be held invalid or unenforceable, to remainder of this
Contract, or the application of such terms or provision, to persons or circumstances other than
those as to which it is held invalid or unenforceable, shall not be affected, and every other term
and provision of this Contract shall be deemed valid and enforceable to the extent permitted by
law.
E. All notices required in this Contract shall be sent by certified mail, return receipt
requested, and sent to the addresses appearing on the first page of this Contract.
F. The VILLAGE and CONSULTANT agree that this Contract sets forth the entire
agreement between the parties, and that there are no promises or understandings other than those
stated herein. None of the provisions, terms and conditions contained in this Contract may be
added to, modified, superseded or otherwise altered, except by written instrument executed by
the parties hereto. Any provision of this Contract which is of a continuing nature or imposes an
obligation which extends beyond the term of this Contract shall survive its expiration or earlier
termination.
G. IF THE CONSULTANT HAS QUESTIONS REGARDING THE
APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE
CONSULTANT'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO
THIS CONTRACT, CONTACT THE CUSTODIAN OF PUBLIC RECORDS AT:
(561) 841-3355; NPBCLERKgVILLAGE-NPB.ORG; OR 501 U.S. HIGHWAY
ONE, NORTH PALM BEACH, FL 33408.
In performing services pursuant to this Contract, CONSULTANT shall comply with all relevant
provisions of Chapter 119, Florida Statutes. As required by Section 119.0701, Florida Statutes,
CONSULTANT shall:
1. Keep and maintain public requires required by the VILLAGE to perform the service.
2. Upon request from the VILLAGE's custodian of public records, provide the VILLAGE
with a copy the requested records or allow the records to be inspected or copied within a
reasonable time at a cost that does not exceed the cost provided in Chapter 119, Florida
Statutes, or as otherwise provided by law.
3. Ensure that public records that are exempt or confidential and exempt from public
records disclosure requirements are not disclosed except as authorized by law for the
duration of the Contract term and following completion of the Contract if the
CONSULTANT does not transfer the records to the VILLAGE.
4. Upon completion of the Contract, transfer, at no cost, to the VILLAGE all public records
in possession of CONSULTANT or keep and maintain public records required by the
VILLAGE to perform the services. If CONSULTANT transfers all public records to the
VILLAGE upon completion of the Contract, CONSULTANT shall destroy any duplicate
public records that are exempt or confidential and exempt from public records disclosure
requirements. If CONSULTANT keeps and maintains public records upon completion of
Page 4 of 5
the Contract, CONSULTANT shall meet all applicable requirements for retaining public
records. All records stored electronically must be provided to the VILLAGE, upon
request from the VILLAGE's custodian of public records, in a format that is compatible
with the information technology systems of the VILLAGE.
H. CONSULTANT is aware that the Inspector General of Palm Beach County has the
authority to investigate and audit matters relating to the negotiation and performance of this
Contract, and in furtherance thereof, may demand and obtain records and testimony from
CONSULTANT and its subconsultants. CONSULTANT understands and agrees that in addition
to all other remedies and consequences provided by law, the failure of CONSULTANT or its
subconsultants to fully cooperate with the Inspector General when requested may be deemed by
the VILLAGE to be a material breach of the Contract justifying termination.
IN WITNESS WHEREOF, the VILLAGE and CONSULTANT hereto have made and executed
this Contract as of the day and year first above written.
CALVIN, GIORDANO & ASSOCIATES, INC.
By: _ (�� —
Print Name: beonLs 6 / 04c ly
Position: pyes .
VILLAGE,PF NORTH PALM BEACH
By:N��G
DARRYL C. UBREY
MAYOR
ATTEST:
BY:
M tLISSA TEAL
VILLAGE CLERK
APPROVED AS TO FORM AND
LEGAL S�UF�FICIENC�jY
BY:
VILLAGE ATTORNEY
Page 5 of 5
EXHIBIT "B"
WORK ORDER NO.1
SCOPE OF SERVICES
Design Services
For
Anchorage Park
OVERVIEW
Calvin, Giordano & Associates, Inca (CGA) shall provide additional professional services in support of
the Village's improvements to Anchorage Park.
The scope covers the Master Plan and Construction Phase 2.
The CGA's Landscape Architect will work with the Village Manager and the Village Staff to provide a
master plan for the Phase 2 part of the park development. Phase 2 will be broken down into Phase 2A
and Phase 213. Phase 2A will satisfy the current grants which are on a time line specific. The overall
master plan will address the branding of the park to include the following, keeping in mind the Phase 1
improvements are already developed:
• Accessible access to dock on north and south ends including kayak launch
• New floating docks on north end and new day docks in middle. New cap on south leased docks.
New kayak launch. Docks to be designed in conjunction with marine engineer.
• New bulkhead cap on south marina docks.
• Lighting standards
• Wall concepts (around RV/Boat storage)
• Site furniture
• Shelter style
Landscape scheme
Note: Seawall on the north end and the day docks are already permitted through DEP.
Phase 2A will include construction documents to allow for the bidding, permitting, and construction of
said elements in the site plan which are under the scope of the landscape architect (landscape design and
hardscape design). This area is primarily along the waterfront and includes two shade shelters, access to
floating docks and day docks (designed by others), kayak launch, and parts of the trail system.
Phase 213 will include the final parking configuration along the south side of the park near the marina
and the final configuration of the boat storage area including perimeter storage wall, delineation of the
play field, and restroom facility. In addition, a planting plan will be developed along Anchorage Drive
which enhances the on -street parking and the trail as the `front door' to the park.
The Master Plan will include both Phase 2A and 213. Phase 2A will require definition as a stand-alone
Master Plan (2A) to meet the requirements of the grant and allow for permitting.
SCOPE OF SERVICES
Task 1— Preliminary Master Plan Design Phase 2A and 2B
The Landscape Architect shall prepare a Master Plan of the Phase 2A and 2B based upon the
Owner program including grant requirements, site constraints, cultural conditions, and
professional design expertise. Said plan shall delineate all existing and proposed hardscape
elements including paved areas, curbs, landscape walls and fences, safe sight lines, etc. as well
as the existing surrounding plant massing (general) and the proposed landscape plant massings
and trees to convey, in a general manner, the landscape design concept as envisioned by the
Landscape Architect. Area lighting will be indicated and will work with the proposed
landscape. From the approved Master Plan, Phase 2A will be developed to clearly indicate the
scope covered in the grant.
Deliverables
Master Plan Phase 2A and 2B
Master Plan Phase 2A only
Up to Two Team Meetings
Two Schematic Presentation Plan Graphics, rendered, and colored
Attendance at up to two workshops/Village Council Meetings
Schedule
Plans shall be complete August 2, 2017.
Task 2 — Phase 2A Site Plan
PHASE 2A SITE PLAN: Architect shall prepare Landscape Construction Documents for said project at
a scale to be determined by the Landscape Architect. The documents shall delineate and locate all
proposed and existing landscape plantings reflecting all the proposed and existing site engineering as
designed by others. The plan shall be suitable for construction of the proposed landscape design. Said
Landscape plans, based upon the approved concept, shall delineate the proposed planting in detail and
will include type, size, spacing, and Florida grade of all plants at the time of planting. The design will
confonn to applicable agencies and be suitable for bidding. It will be submitted to the Client for a final
review and comment.
1. LIGHTING DESIGN: The Landscape Architect shall only specify new fixtures as will be needed to
meet the grant requirements. Electrical engineering and photometrics by others.
2. LANDSCAPE DESIGN: This shall include the area of any new improvements to park as per the
grant program. It will include the specifications of all plant material.
3. HARDSCAPE LAYOUT: This shall include those areas as noted in the grant programs which
include but not limited to the trail system, two pavilions and access to them and any modifications to
parking which may be required. Accessible access to the docks and the kayak launch will be
addressed.
4. PAVILION SPECIFICATION: This will include specifications to match the style of the existing
pavilions with additional/optional additions which may aide in the branding of the park.
5. IRRIGATION DESIGN: Minimal irrigation will be designed to accommodate the existing system and
the new geometry and plant material
Deliverables
60% CDs
100% CDs/Permit
Project Cost Estimate
Unpbtiles\manager share\Anchorage park\VNPB WO 107-01-2017 Scope of Services for Anchorage Park Design Services REVISED 07 14
17.doc
Schedule
Plans to be Complete August 30t1i, 2017 so that construction can start October 1, 2017 (FIND Grant) and
be finished by March 2018 (Land & Water Grant)
Task 3 — Phase_2B Site Plan
PHASE 2B SITE PLAN: Architect shall prepare Landscape Construction Documents for said project at
a scale to be determined by the Landscape Architect. The documents shall delineate and locate all
proposed and existing landscape plantings reflecting all the proposed and existing site engineering as
designed by others. The plan shall be suitable for construction of the proposed landscape design. Said
Landscape plans, based upon the approved concept, shall delineate the proposed planting in detail and
will include type, size, spacing, and Florida grade of all plants at the time of planting. The design will
conform to applicable agencies and be suitable for bidding. It will be submitted to the Client for a final
review and comment.
1. LIGHTING DESIGN: The Landscape Architect shall only specify new fixtures as will be needed to
meet the overall Master Plan.
2. LANDSCAPE DESIGN: This shall include the area of any new improvements to the park including
the front right-of-way planting, along the RV/Boat Privacy Wall, storm water retention areas, and
new planting reflected in changed parking areas. It will include the specifications of all plant
material.
3. HARDSCAPE LAYOUT: This shall include those areas as noted above which include but not
limited to the right-of-way buffer, the new restroom, the reconfigured parking, and the Storage Area
Wall.
4. IRRIGATION DESIGN: Irrigation will be noted to be adjusted to any changes these plans may bring
to the existing system.
Deliverables
60% CDs
100% CDs/Permit
Project Cost Estimate
Schedule
Plans to be Complete in Six Weeks.
TASK 4 CONSTRUCTION ADMINISTRATION PHASE 2A:
The Landscape Architect shall provide construction administration services for the landscape and
hardscape layout (excluding docks and bulkheads) as follows;
1. Review of all shop drawings
2. Initial Landscape Contractor meeting
3. Review and certification of all trees prior to planting at site for conformance to Florida #1 grade
of material.
4. Provide up to three (3) site visits for certification/progress purposes.
5. Substantial Completion walk-through and punch list.
6. Final Inspection and Certification of completion and compliance of the landscape job to the
Owner/Client.
Deliverables
Items Defined above
\\npbfiles\manager_shareUnchorage park\VNPB WO 107-01-2017 Scope of Services for Anchorage Park Design Services REVISED 07 14
17.doc
Schedule
Prior to March, 2018
TASK 5 CONSTRUCTION ADMINISTRATION PHASE 213:
The Landscape Architect shall provide construction administration services as follows for the landscape
and hardscape layout;
1. Review of all shop drawings
2. Initial Landscape Contractor meeting
3. Review and certification of all trees prior to planting at site for conformance to Florida #1 grade
of material.
4. Provide up to three (3) site visits for certification/progress purposes.
5. Substantial Completion walk-through and punch list.
6. Final Inspection and Certification of completion and compliance of the landscape job to the
Owner/Client.
Deliverables
Items Defined above
Schedule
As needed per aspect
ADDITIONAL SERVICES
Provide additional services as mutually agreed upon with rates based on the approved rate table as
outlined in Consultant's contract with the Town of Jupiter.
COMPENSATION
See attached Exhibits A, B & C
TIME OF PERFORMANCE
The services shall be completed as described above.
Submitted By:
Calvin, Giordano & Associates, Inc.
Dennis J. Giordano
President
Date: C 1�
\\npbfiles\manager_share\Anchorage park\VNP13 WO 107-01-2017 Scope of Services for Anchorage Park Design Services REVISED 07 14
17.doc
Exhibit
Work Order No. 1 Design Services for
Anchorage Park
CONTRACT PERFORMANCE
Proposed fee and schedule for completion of Task under Work Order No. I is summarized below.
SUMMARY OF PROPOSED FEES
Proposed labor costs and associated expenses for basic Professional Engineering services are tabulated
below.
Basic Services Direct LaborCost
Task 1 -Preliminary Master Plan Design Phase 2A and 2B $12,008.02
Task 2 - Phase 2A and 2B $8,524.82
Task 3 - Phase 2B Site Plan $8,987.08
Task 4 - Construction Support & Certification Phase 2A $3,251.89
Task 5 --Construction Support & Certification Phase 2B $6,579.04
Meetings not included in Tasks 1 - 5 Above Hourly
Expenses (Inc. Travel/Mailings) $2,000.00
Total (NTE) Cost for Project (plus hourly expenses) $41,350.85
\\npbriles\manager share\Anchorage park\VNPB WO 107-01-2017 Scope of Services for Anchorage Park Design Services REVISED 07 14 17.doc
Exhibit B
Work Order No. 1
Design Services for
Anchorage Park
Work Activity Position Hours Rate Total
Task 1 -Preliminary Master Plan Design Phase 2A and 2B
Landscape Plans Project Manager (LA)
26
$188.13
$4,891.38
Sr. Landscape Arch
0
$155.88
$0.00
Landscape Arch
28
$118.25
$3,311.00
Sr. CADD/Draftsman (LA)
28
$80.63
$2,257.64
CADD/GIS Technician (LA)
0
$64.50
$0.00
Sr. Designer (LA)
16
$96.75
$1,548.00
Designer (LA)
0
$86.00
$0.00
Sr. Admin Assist. (LA)
0
$53.75
$0.00
Admin Assist. (LA)
0
$32.25
$0.00
Task 1 Total Not To Exceed
0
$53.75
$12,008.02
Task 2 - Phase 2A and 2B
Landscape Plans
Project Manager (LA)
14
$188.13
$2,633.82
Sr. Landscape Arch
0
$155.88
$0.00
Landscape Arch
22
$118.25
$2,601.50
Sr. CADD/Draftsman (LA)
0
$80.63
$0.00
CADD/GIS Technician (LA)
0
$64.50
$0.00
Sr. Designer (LA)
34
$96.75
$3,289.50
Designer (LA)
0
$86.00
$0.00
Sr. Admin Assist. (LA)
0
$53.75
$0.00
Admin Assist. (LA)
0
$32.25
$0.00
Task 2 Total Not To Exceed
$8,524.82
Task 3 - Phase 2B Site Plan
Landscape Plans
Project Manager (LA)
16
$188.13
$3,010.08
Sr. Landscape Arch
0
$155.88
$0.00
Landscape Arch
26
$118.25
$3,074.50
Sr. CADD/Draftsman (LA)
0
$80.63
$0.00
CADD/GIS Technician (LA)
0
$64.50
$0.00
Sr. Designer (LA)
30
$96.75
$2,902.50
Designer (LA)
0
$86.00
$0.00
\\npbfileslmanager_share\Anchorage pork\VNPB WO 107-01-2017 Scope of Services for Anchorage Park Design Services REVISED 07 14 17.doc
Sr. Admin Assist. (LA) 0 $53.75 $0.00
Admin Assist. (LA) 0 $32.25 $0.00
Task 3 Total Not To Exceed $8,987.08
Task 4 - Construction Support & Certification Phase 2A
Landscape Plans Project Manager (LA)
3
$188.13
$564.39
Sr. Landscape Arch
0
$155.88
$0.00
Landscape Arch
8
$118.25
$946.00
Sr. CADD/Draftsman (LA)
0
$80.63
$0.00
CADD/GIS Technician (LA)
0
$64.50
$0.00
Sr. Designer (LA)
18
$96.75
$1,741.50
Designer (LA)
0
$86.00
$0.00
Sr. Admin Assist. (LA)
0
$53.75
$0.00
Admin Assist. (LA)
0
$32.25
$0.00
Task 4 Total Not To Exceed
0
$53.75
$3,251.89
Task 5 - Construction Support & Certification Phase 2B
Landscape Plans
Project Manager (LA)
8
$188.13
$1,505.04
Sr. Landscape Arch
0
$155.88
$0.00
Landscape Arch
20
$118.25
$2,365.00
Sr. CADD/Draftsman (LA)
0
$80.63
$0.00
CADD/GIS Technician (LA)
0
$64.50
$0.00
Sr. Designer (LA)
28
$96.75
$2,709.00
Designer (LA)
0
$86.00
$0.00
Sr. Admin Assist. (LA)
0
$53.75
$0.00
Admin Assist. (LA)
0
$32.25
$0.00
Task 5 Total Not To Exceed
$6,579.04
Expenses (Inc. Travel/Mailings)
$2,000.00
Total for W.O. No.1
$41,350.85
\\npbfiles\manager_share\Anchorage park\VNPB WO 107-01-2017 Scope of Services for Anchorage Park Design Services REVISED 07 14 17.doc
Exhibit C
Work Order No.1
Approved Rates per Contract number EPW 2016-12B
2GHO
t=Y�n�a i
MULTIPLIER:
1.076
TITLE
UNBURDENED
RATES
LOADED
SENIOR ENGINEER PE
_
ENGINEER (PE)
$ _
SENIOR ELECTRICAL ENGINEER (PE)
$ _
ELECTRICAL ENGINEER (PE)
$ _
SENIOR MECHANICAL ENGINEER (PE)
$
MECHANICAL ENGINEER (PE)
$
SENIOR CONSTRUCTION ENGINEER (PE)
$
CONSTRUCTION ENGINEER (PE)
$
SENIOR CONSTRUCTION FIELD REPRESENTATIVE
$
CONSTRUCTION FIELD REPRESENTATIVE
$ _
SENIOR PLANNER
$- 120.00
$ 129.00
PLANNER
$ 75.00
$ 80.63
SENIOR SUBSURFACE UTILITY ENGINEER (PE)
$. -
SUBSURFACE UTILITY ENGINEER (PE)
$
SUBSURFACE UTILITY FIELD CREW
$ -
SENIOR SOLID WASTE MANAGEMENT ENGINEER (PE)
$ -
SOLID WASTE MANAGEMENT ENGINEER (PE)
$ -
SENIOR GEOTECHNICAL ENGINEER (PE)
$ _
GEOTECHNICAL ENGINEER (PE)
$ _
GEOTECHNICAL ENGINEER TECHNICIAN
$ _
SENIOR ENVIRONMENTAL PLANNER
$ _
ENVIRONMENTAL PLANNER
$ _
ENVIRONMENTAL FIELD REPRESENTATIVE
$
SENIOR ARCHAEOLOGIST
$ _
ARCHAEOLOGIST
$ _
ARCHAEOLOGIST TECHNICIAN
$
SENIOR IRRIGATION DESIGNER-
$ 110.00
$ 118.25
IRRIGATION DESIGNER
$ 75.00
$ 80:63
SENIOR ARCHITECT
$ _
ARCHITECT
$ _
LANDSCAPE ARCHITECT PROJECT MANAGER
$ 175.00
$ 188.13
SENIOR LANDSCAPE ARCHITECT
$ 145.00
$ 155.88
LANDSCAPE ARCHITECT
$ 110.00
$ 118.25
SENIOR SURVEYOR
$ _
SURVEYOR/MAPPER
$ _
ASSOCIATE SURVEYOR
$ _
SURVEYING TECHNICIAN
$ _
CREW CHIEF
$ _
INSTRUMENT PERSON
$
ROD PERSON
$
SENIOR ADMINISTRATIVE ASSISTANT
$ 50.00
$ 53.75
ADMINISTRATIVE ASSISTANT
$ 30.00
$ 32.25
ANALYST
$ _
SENIOR CADDIGIS TECHNICIAN (LA)
$ 75.00
',$. 80.63
CADD/GIS TECHNICIAN (LA)
$ 60.00
$ 64.50
SENIOR DESIGNER (LA)
$ 90.00
.$ 96.75
(DESIGNER (LA) $ 80.00 1 $ 86.00
\\npbfiles\manager share\Anchorage park\VNPB WO 107-01-2017 Scope of Services for Anchorage Park Design Services REVISED 07 14 17.doc