2014-57 Accounting Policies and Procedures Manual RevisionRESOLUTION 2014 -57
A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF
NORTH PALM BEACH, FLORIDA, REVISING THE FIXED ASSETS
ACCOUNTING AND RECORDING POLICY AND THE PURCHASING
POLICY AS SET FORTH IN THE VILLAGE'S ACCOUNTING POLICIES
AND PROCEDURES MANUAL FOR INTERNAL CONTROLS; PROVIDING
FOR CONFLICTS; AND PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the Village Auditor recommended a revision to the Village's Fixed Assets
Accounting and Recording Policy to address intangible assets; and
WHEREAS, Village Administration recommended revisions to the Village's Purchasing Policy
to clarify that bids and proposals shall be submitted to the Village Clerk's Office and to raise the
purchasing threshold for the Food and Beverage Department to the same level as other Village
departments; and
WHEREAS, the Village Council determines that the adoption of the recommended revisions to
the Fixed Assets Accounting and Recording Policy and to the Purchasing Policy, as set forth in
the Accounting Policies and Procedures Manual for Internal Controls, is in the best interests of
the Village and its residents.
NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE COUNCIL OF NORTH PALM
BEACH, FLORIDA as follows:
Section 1. The foregoing recitals are hereby ratified and are incorporated herein.
Section 2. The Village Council hereby adopts the revisions to the Village's Fixed Assets
Accounting and Recording Policy and to the Village's Purchasing Policy as identified in Exhibit "A"
attached hereto and incorporated herein by reference. These revised procedures shall be included
in the Village's Accounting Policies and Procedures Manual for Internal Controls.
Section 3. All resolutions or parts of resolutions in conflict herewith are hereby repealed to
the extent of such conflict.
Section 4. This Resolution shall take effect immediately upon adoption.
PASSED AND ADOPTED THIS 11TH DAY OF SEPTEMBER, 2014.
(Village Seal)
MAYOR
ATTEST:
�C/ we
VILLAGE CLERK
Accounting Polices & Procedures Manual
Village of North Palm Beach
Fixed Assets Accounting and Recording
The Village follows the capitalization requirements of GASB Statement #34 (Asset Capitalization &
Depreciation Guidance) for its fixed assets.
General Definition
Capital assets include: land, land improvements, buildings, building improvements, construction in
progress, machinery and equipment, vehicles and infrastructure.
Recording and Tagging
Departments will fill out the fixed asset worksheet for all newly acquired assets with the following
information:
a. Description
b. Price
c. Department
d. Location
e. Condition
f. Custodian
g. VIN — Manufacturer — Model — Model Year — License Number
h. Estimated life
i. Vendor, Purchase Order Number, Inventory Number, Inventory Date, Amount
Once information is received a tag number is assigned and information is put into the system. A print out
of the information is run and the tag number is attached to the print out. The print out and tag number are
sent to the Department Head to put the metal asset tag number on the equipment. The copy of the print out
is to be retained by the department until equipment is disposed.
Recording Land
Land is to be capitalized but not depreciated. It is recorded at historical cost and remains at that cost until
disposal. If there is a gain or loss on the sale of land, it is reported as a special item in the statement of
activities.
Recording Land Improvements
Land improvements include items such as excavation and non - infrastructure utility installation; driveways,
sidewalks, parking lots, flagpoles, retaining walls, and fencing, outdoor lighting, and other non - building
improvements intended to make the land ready for its intended purpose. Land improvements can be further
categorized as non - exhaustible and exhaustible.
Non - Exhaustible - Expenditures for improvements that do not require maintenance or
replacement, expenditures to bring land into condition to commence erection of structures,
expenditures for improvements not identified with structures, and expenditures for land
improvements that do not deteriorate with use or passage of time are additions to the cost of land
and are generally not exhaustible and therefore not depreciable.
Exhaustible - Other improvements that are part of a site, such as parking lots, landscaping and
fencing, are usually exhaustible and are therefore depreciable. Depreciation of site improvements
is necessary if the improvement is exhaustible.
Updated: 9 -11 -14 Page 24 of 54
Accounting Polices & Procedures Manual
Village of North Palm Beach
Recording Buildings
Buildings should be recorded at either their acquisition cost or construction cost. The cost of new
construction should be carefully evaluated. Usually projects consist of major components such as land, land
improvements, building construction (including professional fees and permits), furniture, fixtures and
equipment. In addition, buildings include components (e.g., roof, air conditioner system, etc.) that should
be recorded separately when significant because these building components have different useful lives. The
value of each component needs to be determined and placed within its own category.
Recording Building Improvements
Building improvements that extend the useful life should be capitalized. Examples of building
improvements include roofing projects, major energy conservation projects, or remodeling and replacing
major building components. Only those projects that meet the capitalization threshold need to be included.
Recording Construction in Progress
Construction in progress should be capitalized and not depreciated. It should be reported with land and
other non - depreciating assets at the government -wide level. Unspent debt proceeds from capital assets
related debt should be reported in the net assets section of the statement of net assets as "restricted for
capital projects."
Recording Machinery and Equipment
Assets such as furniture, machinery and equipment (that meet threshold levels) should be identified and
inventoried. Some assets, individually, may fall below the capitalization threshold but may be purchased in
large quantities by the Village. Examples include library books, textbooks and computers. The Village
should aggregate such assets and consider the materiality and significance of them and if material or
significant capitalize such items either individually or in the aggregate.
Recording Vehicles
Vehicles should be identified, inventoried, and if applicable depreciated.
Recording Intangible Assets
Intangible assets are defined as intangible resources that lack a physical substance, are nonfinancial in
nature, and have a useful life that extends beyond a single fiscal year. Examples include easements, land
use rights (i.e. water rights), patents, trademarks and copyrights. In addition, intangible assets include
computer software that is purchased, licensed or internally generated (including websites) as well as outlays
associated with an internally generated modification of computer software. Only those intangible resources
that meet the capitalization threshold should be capitalized.
Recording Infrastructure
Infrastructure assets are long -lived capital assets that normally can be preserved for a significant greater
number of years than most capital assets and that are normally stationary in nature. Examples include
roads, bridges, tunnels, drainage systems, water systems, and dams. Infrastructure assets do not include
buildings, drives, parking lots or any other examples given above that are incidental to property or access to
the property.
Updated: 9 -11 -14 Page 25 of 54
Accounting Polices & Procedures Manual
Village of North Palm Beach
Capitalization Threshold
Capital assets and infrastructure are capitalized and depreciated as outlined in the capitalization threshold
table below:
Capitalization Threshold Table:
Deletions
To delete equipment or an asset from asset records the asset worksheet should be filled out for retire date,
disposal code, and sell price.
Physical Inventory
Physical inventory of all fixed assets must be taken annually.
Each department will be responsible for taking an annual physical count of their department's inventory per
the list provided by the Finance Department. Department Head shall certify the complete physical count,
additions, deletions and changes marked on the list, and reconciliation of all discrepancies.
The Department of Finance will be responsible for keeping up to date listings of all fixed assets.
Exception
Department Heads may request the Finance Department to track and inventory any item less than $5,000.
Updated: 9 -11 -14 Page 26 of 54
Capitalize and De reciate
Land
Capitalize only
Land improvements
$25,000
Building
$50,000
Building Improvements
$50,000
Construction in Progress
Capitalize only
Machinery & Equipment
$5,000
Vehicle
$5,000
Intangible Assets
Internally Generated Software
$100,000
Purchased Software
$25,000
Easements
$5,000
Other Intangible Assets
$100,000
Infrastructure
$250,000
Deletions
To delete equipment or an asset from asset records the asset worksheet should be filled out for retire date,
disposal code, and sell price.
Physical Inventory
Physical inventory of all fixed assets must be taken annually.
Each department will be responsible for taking an annual physical count of their department's inventory per
the list provided by the Finance Department. Department Head shall certify the complete physical count,
additions, deletions and changes marked on the list, and reconciliation of all discrepancies.
The Department of Finance will be responsible for keeping up to date listings of all fixed assets.
Exception
Department Heads may request the Finance Department to track and inventory any item less than $5,000.
Updated: 9 -11 -14 Page 26 of 54
Accounting Polices & Procedures Manual
Purchasing
Objective
Village of North Palm Beach
The primary objective of the Village's purchasing operation is to maximize the value of the dollar spent.
All Village departments are responsible for accomplishing this objective by planning for future purchase
needs and completing them in an economical manner.
Responsibilities of Finance Department
- Maintain an up to date vendor list.
- Process purchase requisitions.
- Prepare and issue purchase orders.
- Pay vendor invoices.
Responsibilities of Village Clerk
- Maintaining bid files.
Responsibilities of Operating Departments
- Obtain prices on comparable items.
- Search for new sources of goods and services and provide these vendor names to the Finance
Department.
- Provide complete information on items to be purchased on the purchase requisitions and reference the
budget line item description.
- Provide appropriate documentation with purchase requisitions as required.
- Plan for purchases to minimize emergency purchases.
- Prepare technical specifications.
- Determine if sufficient funds are available in the budgeted line item.
- Attempt to use the Finance Department's vendor list as a minimum for all quote requirements.
Responsibilities of Village Manager
- Advertise forbids.
- Take formal bids.
Updated: 9 -11 -14 Page 7 of 54
Accounting Polices & Procedures Manual
Purchasing Policy
Detertnininsz Purchasinsz Methods:
Village of North Palm Beach
a. All purchases that are budgeted to exceed $10,000 on either an annual basis or span across fiscal years
such as a "multi- year" contract:
1. Must be formally advertised in a newspaper of general circulation with the advertisement being no
less than fourteen (14) days prior to the opening of bids.
2. Must be awarded on a sealed bid basis by vote of Village Council.
3. The vendors list will be used as a minimum notification list of available vendors for the purposes
of soliciting bids.
b. All purchases having an estimated cost between $2,500 and $10,000:
1. Require three (3) quotations. A written quote from each vendor is to be attached to the requisition.
Where a written quote is not available and on approval of the Village Manager, a memorandum
from the Department Head documenting the three (3) verbal quotes is required. No hand -written
quotes will be accepted.
2. Shall be authorized by Department Head, Finance Director, and Village Manager.
c. Purchases having an estimated cost of up to $2,500, unless otherwise described in this manual:
1. Do not require bids or three (3) quotes; however, Department Heads are encouraged to obtain the
most cost - effective price.
2. Shall be authorized by Department Heads.
d. Exceptions — In certain instances exceptions to the above may exist and purchases may be
accomplished using alternate methods:
1. Through the use of the emergency purchase provisions as provided for in the Emergency
Purchases section of this manual.
2. When annual contracts exist, i.e. gas, oil, tires, office supplies, etc.
3. When requirements imposed by federal, state, or county grants provide different regulations.
4. When the Village Manager deems it appropriate to use procedures of more formality than set out
above.
5. When the Village Council waives the purchasing rules and regulations.
e. The purchase of bulk motor and diesel fuel necessary to operate Village vehicles and the purchase of
inventory and goods for resale or distribution to the public shall not be subject to the rules and
regulations set forth herein and may be approved by the Village Manager and/or the Finance Director.
f. The purchase of food and beverage inventory necessary to operate the Village Restaurant shall not be
subject to the rules and regulations set forth herein and shall require Village Manager approval when
the total order being placed exceeds $2,500.
g. Expenditures for utilities, advertising, subscriptions, registration fees, training, travel, seminars and
lectures, performing artists and entertainers, membership dues, uniform allowances, and similar
products or services for which competitive procurement is either not available or wholly impracticable
shall not be subject to the rules and regulations set forth herein and may be approved by the Village
Manager and/or the Finance Director.
Updated: 9 -11 -14 Page 8 of 54
Accounting Polices & Procedures Manual
Initiating a Purchase
Purchase Requisition
Village of North Palm Beach
A purchase requisition must be completed and submitted to the Finance Department with the appropriate
documentation attached. Where equipment is covered by maintenance contracts, requests for service may
be made directly by the respective department. Copies of all approved maintenance agreements shall be
submitted to the Finance Department at the beginning of each fiscal year. An annual purchase order that
shall not exceed one year will be issued, if required by the vendor.
Requisition Preparation
Procedure to process regular requisitions:
a. Print each requisition in duplicate and give the following:
1. Department account number.
2. Date of requisition.
3. Suggested vendor name and address.
4. Village delivery location.
5. Quantity.
6. A complete, detailed description of the item(s) to be purchased along with a budget line reference.
7. Estimated net cost of line items of goods and services.
8. Estimated cost of shipping and handling.
9. Signature of department head which indicates department head's approval of purchase.
b. When necessary, bid documentation, i.e. telephone bids, requests for quotations, etc. should be
attached to the purchase requisition.
c. Purchase requisition originals are to be sent to the Finance Department.
d. Second copy is kept in the requesting department's file.
e. Upon receiving the requisition, Finance will determine the availability of funds in the department's
account. If the funds are available, preparation and processing of the purchase order will be completed
and forwarded to the Village Manager for final authorization.
f. Requisitions over $10,000 will be subject to the bidding process. Once the Village Council awards the
bid to a vendor, the operating department must prepare and forward to the Finance Department the
purchase order requisition along with a copy of the bid documentation and the adopted resolution.
g. The Village's purchasing policy allows management to "piggyback" on:
1. Current federal supply schedules, U.S. General Services Administration (GSA) or any other
federal agency contracts;
2. Current cooperative purchase contracts; and
3. Other state and local government contracts for labor and materials, providing those government
contracts identify those specific services or materials required and the government contract is both
active and no older than 18 months from the date of the requested purchase.
If the "piggyback" provision is to be utilized, the operating department will obtain a verbal quote from
a secondary qualified vendor to verify the "fair market" value of the item or services sought. If this
quote is significantly lower, staff will go through the normal purchasing/bidding procedures. The
verbal quote verification procedure will be indicated as part of the back -up material for the purchase.
Updated: 9 -11 -14 Page 9 of 54
Accounting Polices & Procedures Manual
Village of North Palm Beach
h. In the event the "piggy- back" provision is utilized and a "change" in services, outside the scope of the
government contract is required, that change will be treated as a "change order" in accordance with this
policy.
Purchasing Procedures, Bids, Contracts, Vendor Selection, etc.
Formal Bidding
Formal bids are required for purchases in excess of $10,000.
Writing Specifications
Upon submitting a request for formal bidding, the department should also transmit desired specifications to
be included as a part of the bidding process.
Care should be taken to design specifications so that they are not so narrow as to limit competition
unnecessarily. Department heads have the responsibility for complying with this guideline.
Identifying Suppliers
Operating departments are responsible for maintaining a comprehensive, updated list of suppliers of
various products frequently purchased by that department. It is the Village's policy to award to the lowest
qualified bidder offering merchandise conforming to pre- defined specifications.
Sealed Bid Opening
All bids /proposals shall be submitted to the Village Clerk's Office. All sealed bids are to be opened at the
exact time, date and place specified in the bid package. A bid package contains: (1) notice to bidders; (2)
complete bid specifications and (3) contract documents, if appropriate. All bids are to be opened publicly
with tabulation being made available to all vendors participating. Formal bids are to be checked for proper
submission of any required bid deposits, bonds, etc. All sealed bids will be opened by a bid board
consisting of the Village Manager, the Department Head concerned, and the Village Clerk. After
evaluation, a recommendation will be made by the Village Manager for transmittal to the Village Council.
Sole Source Items
"Sole source purchases are the acquisition of goods and services that for all practical purposes can only be
obtained from a single vendor, usually because of limited technology, technological compatibility with
existing systems, goods or services already in use by the Village or other unique qualities of the goods or
services that preclude a competitor's price comparison." All sole source purchases will be documented by
a memo from a Department Head justifying why the purchase is sole source. Every reasonable effort
must be made to locate competitive suppliers. Only the Village Manager may certify an item as sole
source. Approval of sole source purchases over $10,000 is to be made by the Village Council.
Contracts, Retainage, Change Orders, & Payment
a. The Village Manager is authorized to sign contracts on behalf of the Village that involve expenditures
for goods and services that are line items within the Village budget and do not exceed ten thousand
($10,000). Prior to execution of contracts, the Village Manager shall first comply with the purchasing
regulations adopted by the Village Council and have the contracts reviewed by the Village Attorney
for legal sufficiency.
b. Contracts for over $10,000 must be approved by the Village Council.
Updated: 9 -11 -14 Page 10 of 54
Accounting Polices & Procedures Manual
Village of North Palm Beach
c. The annual contracts awarded by Palm Beach County, the State of Florida and the Palm Beach County
Cooperative Purchasing Council, and other governmental agencies for labor and materials are accepted
by the Village in accordance with their terms.
d. The American Institute of Architecture, AIA Document G702 -1992, Application and Certificate for
Payment, is the form that is completed by the Contractor and Certified by the Architect/Engineer as
part of their payment request. This form shows the Original Contract amount then the progression of
payments previously paid, retainage, current request and balance of contract to complete the Project.
The percentage of retainage is specified in the Agreement that is executed by the Village and the
Contractor. A standard of ten percent (10 %) will be used unless adjusted by the Mayor and Council.
Change Orders
A Change Order is a written instrument prepared by the Contractor, certified by the Architect/Engineer and
approved by the Village stating their agreement to the following:
a. Actual change in work required.
b. The dollar amount of the adjustment and its effect on the Contract's Total Sum.
c. The extent of the adjustment and how it will affect the Contract's timeframe.
d. If a lump sum payment is necessary, the request must be properly itemized and supported by sufficient
substantiating data to permit evaluation. All parties involved must mutually accept the adjustment(s) as
presented.
e. Unit prices stated in the Contract Documents or subsequently agreed upon must be mutually acceptable
to all parties in involved.
f. If costs are to be determined, all parties must agree upon a mutually acceptable fixed or percentage fee.
Change Order Process
a. All proposed change orders must be approved by the Village Engineer (if involved in the project), the
Department Head overseeing the project, and the Village Manager.
b. The Village Manager has the authority to approve change orders under $10,000 that are within the
original scope of the project and that do not exceed the original budget line item for the project,
however, the Village Council will be notified of any such change orders for their approval and
ratification at the next scheduled Council Meeting.
c. All change orders in excess of $10,000 must be brought to the Village Council for approval.
d. If exigent circumstances exist requiring immediate action and a delay would adversely impede the
project operationally, the Village Manager can with written documentation, authorize a change order in
excess of the $10,000. The Village Manager will be responsible for immediately reporting this Change
Order at the next scheduled Council Meeting for ratification.
Updated: 9 -11 -14 Page 11 of 54
Accounting Polices & Procedures Manual
Design -Build Contracts
Village of North Palm Beach
Except as provided herein, the foregoing Policies and Procedures are not applicable to the procurement of
design -build contracts. Design -build contracts shall comply with the following rules:
a. If the Village Manager determines that a design -build contract is the appropriate method of
procurement for any construction project, a design criteria package for the design and construction of
the project shall be prepared and sealed by a design criteria professional either employed or retained by
the Village. The design criteria professional shall meet the requirements of subsection (2) of Section
287.055(2), Florida Statutes (Consultants' Competitive Negotiation Act). If the Village enters into a
professional services contract for preparation of the design criteria package, the selection of the design
criteria professional shall comply with subsections (4) and (5) of Section 287.055, Florida Statutes.
b. The design criteria package shall specify performance -based criteria for the project, including but not
limited to the legal description of the site; survey information concerning the site; interior space
requirements; material quality standards; schematic layout and conceptual design criteria for the
project; cost or budget estimates; design and construction schedules; site development requirements,
provision for utilities, stormwater retention and disposal; and parking requirements.
c. A design criteria professional who has been selected to prepare the design criteria package shall not be
eligible to render services under a design -build contract executed pursuant to the design -build criteria
package.
d. The Village shall publicly announce in a uniform and consistent manner the fact that design -build
services are required. The announcement shall include a general description of the project, procedures
for obtaining the request for proposals, and the time within which interested design -build firms may
submit proposals.
e. The Village Manager or his or her designee shall establish criteria, procedures, and standards for the
evaluation of design -build contract proposals, weighted for the particular project, and shall solicit
competitive proposals pursuant to the prepared design criteria package from qualified design -build
firms for the project under consideration. In addition to price, evaluation factors shall include, but not
be limited to, ability of professional personnel; past performance, ability to meet time and budget
requirements; location of firm; and recent, current and projected work loads.
For each public construction project involving the award of a design -build contract, the Village
Manager may initiate a two -step process whereby firms first submit qualification statements. The
Village Manager or, at the Manager's option a selection committee selected by the Village Manager,
shall evaluate qualification statements in accordance with published criteria, including, but not limited
to, past experience; availability; and the qualifications of key personnel and (provided that at least
three (3) qualification statements have been submitted) select no fewer than three (3) qualified design -
build firms from which competitive proposals shall be solicited based on the design criteria package.
This step is not mandatory and the Village Manager may forego the pre- qualification process.
g. The Village Manager or, at the Manager's option, an evaluation committee selected by the Village
Manager, shall evaluate the proposals in accordance with the criteria set forth the solicitation and
recommend to the Village Council no fewer than three (3) qualified design -build firms in order of
preference. The Village Council may require public presentations and shall rank the firms. The
Village Manager, in consultation with the Village Attorney, shall then commence negotiations with the
top - ranked firm.
h. Should the Village Manager be unable to negotiate a satisfactory contract with the top - ranked firm,
negotiations shall be formally terminated in writing and negotiations commenced with the second -
ranked firm. Should the Village Manager be unable to negotiate a satisfactory contract with the
second - ranked form, negotiations shall be formally terminated in writing and negotiations commenced
Updated: 9 -11 -14 Page 12 of 54
Accounting Polices & Procedures Manual
Village of North Palm Beach
with the third - ranked firm. Should the Village Manager be unable to negotiate a satisfactory contract
with any of the selected firms, additional firms shall be selected in accordance with the foregoing
procedures and negotiations shall continue until a contract is reached.
i. The Village Manager shall consult with the design criteria professional who prepared the package
concerning evaluation of the proposals, approval of detail work and drawings for the project and
compliance of project construction.
j. Each contract for design -build services shall contain a prohibition against contingent fees as required
by law.
k. In the case of a valid public emergency, the Village Manager may suspend the procedures specified
herein, and authorize negotiations of a design -build contract with the best qualified design -build firm
available at that time.
Contract Payment Process
Certificates for Payment
An Architect and/or an Engineer will be engaged on all professionally bid projects which are new or
structurally reengineered. In those instances:
a. The Architect/Engineer will, within seven days after receipt of the Contractor's Application for
Payment, either issue to the Village a Certificate for Payment, with a copy to the Contractor, or notify
the Contractor and the Village in writing of the Architect/Engineer's reasons for withholding
certification in whole or in part.
b. The issuance of a Certificate for Payment will constitute a representation by the Architect/Engineer to
the Owner that the work has progressed to the point indicated and that the quality of the Work is in
accordance with the Contract Documents. It will further constitute a representation that the Contractor
is entitled to payment in the amount certified.
Final Completion & Final Payment
a. Upon receipt of written notice that the work is ready for final inspection and acceptance and upon
receipt of a final Application for Payment, the Architect/Engineer will promptly make such inspection
and, when the Architect/Engineer finds the work acceptable under the Contract Documents and the
Contract fully performed, the Architect/Engineer will promptly issue a final Certificate for Payment.
b. Neither final payment nor any remaining retained percentage shall become due until the Contractor
submits to the Architect/Engineer:
1. an affidavit that payrolls, bills for materials and equipment and other indebtedness connected with
the work have been paid or otherwise satisfied,
2. a certificate evidencing that insurance required by the Contract Documents to remain in force after
final payment is currently in effect and will not be cancelled or allowed to expire until at least 30
days prior to written notice has been given to the Village,
3. a written statement that the Contractor knows of no substantial reason that the insurance will not
be renewable to cover the period required by the Contract Documents,
4. consent of surety, if any, to final payment,
5. if required by the Village, other data establishing payment or satisfaction of obligations.
Updated: 9 -11 -14 Page 13 of 54
Accounting Polices & Procedures Manual
Village of North Palm Beach
NOTE: Contractor's application for payment (partial or final) for repairs or maintenance to
"existing" systems and infrastructure can be authorized by the Village Department Head for which
those repairs /maintenance was authorized.
c. Acceptance of final payment by the Contractor, a Subcontractor or material supplier shall constitute a
waiver of claims by that payee except those previously made in writing and identified by that payee as
unsettled at the time of final Application for Payment.
d. The Certificate of Completion and the Application for Final Payment forms must be completed. The
Application for Final Payment requests the release of the retainage and requires the following
signatures:
1. For Projects $10,000 or less, the Director managing the project and the Village Manager will sign
off upon completion of the project.
2. Projects from $10,001 to $100,000 —The Director managing the project along with the Director of
Community Development and the Village Manager will sign -off upon completion of the project.
3. Projects exceeding $100,000 requires the same signature authority as item #2 and will be
forwarded to the Mayor and Council for final closeout and release of contractual retainage.
Purchase Orders
Use of Purchase Orders
A purchase order should be used for the purchase of a single item over $2,500 that is not purchased on a
regular basis. This would include all purchases not covered by a blanket purchase order. All purchases that
are budgeted to exceed $10,000 on an annual basis or span across fiscal years such as a "multi- year"
contract surpass the Village's bid threshold and will be bid prior to the beginning of the fiscal year.
Exceptions are outlined in the Purchasing Policy "Determining Purchasing Methods" section, as well as in
the Emergency Purchases section.
Procedure for Issuing a Purchase Order
a. All purchase orders will be issued by the Finance Department.
b. All purchase orders will be sequentially numbered.
c. The purchase order is prepared in triplicate.
d. The purchase order is printed giving the following information:
1.
Purchase order number.
2.
Vendor code number.
3.
Vendor name.
4.
Vendor address.
5.
Vendor contact person.
6.
Vendor telephone number.
7.
Vendor fax number.
8.
Department account number.
9.
Requisition number.
10.
Date of purchase order.
11.
Required delivery date.
Updated: 9 -11 -14 Page 14 of 54
Accounting Polices & Procedures Manual
12. Terms
13. F.O.B. point
14. Destination shipping point.
15. Quantity ordered.
16. Vendor proprietary stock number (if any).
17. Generic description of goods or services ordered.
18. Unit price.
19. Extension
20. Net total of goods and services ordered.
21. Allowable shipping charges.
22. A box checking an original or confirming purchase order.
23. Signature of responsible Village official.
How Purchase Orders are processed
a. The original copy is delivered directly to the vendor.
Village of North Palm Beach
b. The second copy is retained by the Finance Department for account encumbrance and is attached to the
requisition original.
c. The third copy is sent to the Department Head or the requisitioning department.
Cancellation of a Purchase Order
All cancellations of orders must be made by forwarding to the Finance Department the receiving copy of
the purchase order with the word "VOID" printed across the face of said copy. The Department Head
should sign and date all voided purchase orders, as well as provide a brief reason for the void.
Expediting Orders
Once the Finance Department has issued a purchase order, no follow -up work is done on the order by
Finance. It will be the responsibility of the operating department to expedite orders.
Back Orders of Partial Payments
When several items are ordered, the supplier may deliver only a portion of the quantity requested. The
supplier may then advise you that the remainder of the order has been back ordered. The Department Head
should retain the copy of the purchase order until all items are delivered. Should the vendor invoice the
Village for the partial order delivered, the following partial payment procedures should be followed:
a. When the invoice is received, the department head should forward the invoice to the Finance
Department with his or her approval of the partial payment. Notations should be made on the invoice
that the order is "INCOMPLETE" and the purchase order number circled, or noted if it is not
mentioned on the invoice. The Finance Department will use this as authority for partial payment.
Documentation must be sent to the Finance Department indicating which items have been received
before the Finance Department makes the payment on such invoice.
b. The department copy of the purchase order remains in the department until the entire order is filled,
invoiced, or balance canceled.
Blanket Purchase Orders
Blanket purchase orders can be requested from the Finance Department for the purchase of materials,
supplies, parts and similar items over a certain period of time not to exceed a single fiscal year. Examples
include, but are not limited to, office supplies, computer supplies, uniforms, firearms and firearm
Updated: 9 -11 -14 Page 15 of 54
Accounting Polices & Procedures Manual
Village of North Palm Beach
accessories, badges and specialized public safety equipment, hardware store purchases, tires, tubes, and
batteries.
A blanket purchase order may be in any amount up to $10,000 and must be approved by the Department
Director, the Finance Director, and the Village Manager. No single purchase pursuant to a blank purchase
order shall exceed $2,500.
Split Purchases (Pyramidin
a. Split purchases, or pyramiding, is defined as issuing more than one purchase order on the same product
with the intent of circumventing these regulations and/or budget limitations within an unreasonably
short time period such that the totals of the purchase orders equal an amount greater than that
authorized by these regulations. Split purchases are prohibited.
Emergency Purchases
General Policy
True emergencies do occur as a result of parts, supplies, and labor needed to repair equipment and facilities
that are needed to provide services for the health, welfare and safety of the public. Anticipating needs in
advance, whenever possible, will hold emergency purchases to a minimum and allow the use of standard
procedures.
Procedure
a. Emergency purchases between $0 to $2,500, mark invoice "EMERGENCY PURCHASE ". The
invoice must be submitted to and approved by the Department Head, subject to confirmation by
Village Manager.
b. Emergency purchases of more than $2,500 and up to $10,000, mark invoice "EMERGENCY
PURCHASE ", and contact the Village Manager for approval, subject to confirmation by the Village
Council.
c. Emergency purchases over $10,000 are not to be made without the approval of the Village Council.
Purchasing Cards
Recognizing the advent of automated internet supply vendors and the occasional time sensitive
procurements, the utilization of a Village purchasing card is both necessary and required. The Finance
Department shall maintain one purchasing card per department to be utilized in select cases in accordance
with the existing purchasing regulations. Any department needing to use the purchasing card shall request
in writing, to the Finance Director, the intended use of the card, the amount and the account number(s) to
be charged. All requests must be approved by the department head prior to sending it to the Finance
Department. If the request meets all applicable purchasing regulations and the departmental funds are
available, the Finance department will obligate the Village for the purchase by use of the Village's
purchasing card. The department making the purchasing request shall be responsible for providing invoices
(receipts) or other acceptable documentation to the Finance Department immediately upon receipt. All
invoices (receipts) shall be initialed with the account number(s) to be charged.
Sales Tax Exemption
Village purchases are exempt from Florida sales tax. When making purchases, the vendor will be provided
with the sales tax exemption number.
Updated: 9 -11 -14 Page 16 of 54