Loading...
04-24-2014 VC WS-MMINUTES OF THE WORKSHOP SESSION VILLAGE COUNCIL OF NORTH PALM BEACH, FLORIDA \ APRIL 24, 2014 Present: Darryl C. Aubrey, Sc.D., Mayor Robert A. Gebbia, Vice Mayor David B. Norris, President Pro Tern William L. Manuel, Councilman Doug Bush, Councilman Chuck Huff, Interim Village Manager Leonard Rubin, Village Attorney Melissa Teal, Village Clerk ROLL CALL Mayor Aubrey called the meeting to order at 8:55 p.m. All members of Council were present. All members of staff were present. COUNTRY CLUB ENGINEERING SURVEY FINAL REPORT Mr. Huff reported the air - cooled HVAC chiller for the Country Club has been operating at a reduced capacity and three split air conditioning systems are being used to compensate for the diminished capacity. Mr. Huff stated that based on the estimated cost to repair the chiller, Public Works obtained proposals from mechanical engineering firms to perform an engineering survey of the clubhouse and subsequently contracted with RGD Consulting Engineers to survey all mechanical, electrical, plumbing, and structural systems. Brief discussion took place concerning the Engineer's opinion of three possible options for the clubhouse building: 1) leave as -is and repair components when needed; 2) limited renovation of existing building; and 3) demolish existing building and build a new clubhouse. Public Works Director Brian Moree reviewed the estimated cost of various measures that would address the immediate air conditioning issues at the clubhouse. Mr. Moree discussed other areas with the potential to require repairs in the next year. Discussion ensued on the estimated cost to keep the current clubhouse functional until a new clubhouse could be built, should the Council determine to move in that direction. RGD Consulting Engineers President, Robert Davenport, and Mechanical Project Engineer Greg Clements, responded to questions from the Council and offered suggestions. Mr. Huff and Mr. Moree will work on a short-term plan for addressing the HVAC system, with discussion to be held on a long -range plan during Budget Workshop Sessions. ADJOURNMENT With no further business to come before the Council, the meeting was adjourned at 9:20 p.m. C YZZ, I I GL Melissa Teal, CMC, Village Clerk