Ordinance 1978-009 Amends Standard Building Code 1976 Edition Including AppendicesORDINANCE N0, 9-78
AN ORDINANCE OF THE VILLAGE OF NORTH PALM BEAC}{, FLORIDA,
1
AMF,NllING CHAPTF,R 6 OF THE VILLAGE OF NORTH PALM BEACH CODE, T}{E
BUILDING CODE FOR THE VILLAGE, BY ADOPTING BY REFERENCE THERF,TO THC
STANDARD BUILDING CODE, 1976 EDITION, INCLUDING APPENDICES A, R, C,
I:, F, }{, I, {. AND M THERETO AND SETTING FORTH AMENDMENTS TO SAID
STANDARD BUILDING CODE.
BF. IT ORDAINED BY THE VILLAGE COUNCIL OF NORTH PALM BEACH,
FLORIDA:
Section 1. Section 6-11 of the Village of North Palm Beach
1
Code is hereby amended to read as follows:
"Sec. 6-11. ADOPTED BY REFERENCE---Under the
authority of Section 163.295, Florida Statutes,
the Village of North Palm Beach hereby adopts
by reference hereto, the Standard Building
Code, 1976 Edition, including Appendices A,
B, C, E, F, H, I, L and M, and the recommended
amendments of the Palm Beach County Building
Code Advisory Board, as the building code for
the Village. There has been for at least ten
days last past and shall be during the time that
this code is in effect, three copies of such
code and recommended amendments kept available
for public use, inspection and examination."
Section 2. Section 6-12 of the Village of North Palm t3eac}t
Code is hereby amended to read as follows:
"Sec. 6-12. AMENDMENTS, CORRECTIONS AND
ADDITIONS---The following amendments, corrections,
and additions to the recommended amendments of
the Palm Beach County Building Code Advisory
Board are hereby made and adopted; said amendments,
corrections and additions being set forth herein
with reference to and prefaced by the Section number
and title of said amendments, as follows:
1
SECTION 10/.4 - SCHEDULE OF PERMIT FEES, CHARGES AND EXPENSES. Delete
existing first paragraph and rewrite as follows•
1
A
On all buildings, structures or alterations requiring a building permit
as set forth in Section 105. fee shall be paid as required at the time of
filing application in accordance with the following schedule of total val-
uation of the structure. Total valuation may be established by submission of
a signed, norarized contract.
A. BUILDING PERMITS
Amount
Fee
$s7,ooo.
58,000.
s9,ooo.
60,000.
61,000.
62,000.
63,000.
64,000.
65,000.
66,000.
67,000.
68,000.
69,000.
70,000.
71,000.
72,000.
73,000.
74,000.
75,000.
76,000.
77,000.
78,000.
79,000.
so,ooo.
81,000.
8z.ooo.
83,000.
84,000.
85,000.
86,000.
87,000.
88,000.
89,000.
90,000.
91,000.
92,000.
93,000.
94,000.
95,000.
96,000.
97,000.
98,000.
99,000.
100,000,
Amount
Fee
Under $100.
100.
500.
2,000.
3,000.
4,000.
5,000.
6,000.
7,000.
8,000.
9,000.
10,000.
11,000.
12,000.
13,000.
14,000.
15,000.
16,000.
17,000.
18,000.
19,000.
20,000.
21,000.
22,000.
23,000.
24,000.
25,000.
26,000.
27,000.
28,000.
29,000.
30,000.
31,000.
32,000.
33,000.
3~{, OOD.
35,000.
36,000.
37,000.
38,000.
39,000.
40,000.
41,000.
42,000.
43,000.
44,000.
45,000.
x{6,000.
~} 7, 000.
48,000.
49,000.
50,000.
51.,000.
52,000.
53,000.
54,000.
55;000.
56,000.
- 499.
- 1,999.
- 2,999.
- 3,999.
- 4,999.
- 5,999.
- 6,999.
- 7,999.
- 8,999.
- 9,999.
- 10,999.
- 11,999.
- 12,999.
- 13,999.
- 14,999.
- 15,999.
- 16,999.
- 17,999.
- 18,999.
- 19,999.
- 20,999.
- 21,999.
- 22,999.
-.23,999.
- 24,999.
- 25,999.
- 26,999.
- 27,999.
- 28,999.
- 29,999.
- 30,999.
- 31,999.
- 32,999.
- 33,999.
- 34,999.
- 35,999.
- 36,999.
- 37,999.
- 38,999.
-.39,999.
- 40,999.
- 41,999.
- 42,999.
- 43,999.
- 44,999.
- 45,999.
- 46,999.
- 47,999.
- 48,999.
- 49,999.
- 50,999.
- 51,999.
- 52,999.
- 53,999.
- 54,999.
- 55,999.
- 56,999.
$ 5.00
8.00
ls.oo
20.00
25.00
30.00
35.00
40.00
45.00
50.00
55.00
60.00
65.00
70.00
75.00
80.00
85.00
90.00
95.00
100.00
105.00
110.00
115.00
120.00
125.00
130.00
135.00
140.00
145.00
150.00
155.00
160.00
165.00
170.00
175.00
179.00
183.00
187.00
191.00
195.00
199.00
203.00
207.00
211.00
215.00
219.00
223.00
227.00
231.00
235.00
239.00
243.00
247.00
251.00
255.00
259.00
263.00
267.00
- 57,999.
- 58,999.
- 59,999.
- 60,999.
- 61,999.
- 62,999.
- 63,999.
- 64,999.
- 65,999.
- 66,999.
- 67,999.
- 68,999.
- 69,999.
- 70,.999.
- 71,999.
- 72,999.
- 73,999.
- 74,999.
- 75,999.
- 76,999.
- 77,999.
- 78,999.
- 79,999.
- 80,999.
- 81,999.
- 82,999.
- 83,999.
- 84,999.
- 85,999.
- 86,999.
- 87,999.
- 88,999.
- 89,999.
- 90,999.
- 91,999.
- 92,999.
- 93,999.
- 94,999.
- 95,999.
- 96,999.
- 97,999.
- 98,999.
- 99,999.
-100,999.
$271.00
275.00
279.00
283.00
287.00
291.00
295.00
299.00
303.00
307.00
317..00
315.00
319.00
323.00
327.00
331.00
335.00
339.00
343.00
347.00
351.00
355.00
359.00
363.00
367.00
371.00
375.00
379.00
383.00
387.00
391.00
395.00
399.00
403.00
407.00
411.00
415.00
419.00
423.00
427.00
~{31.00
435.00
439.00
443.00
$101,000. - $444.00 plus $1.50 per $1,000
valuation over $101,000.
MOVING BUILDING - $10.00 DEMOLITION $10.00
DRIVEWAYS & SIDEWALKS - $15.00
CONDEMNED BY CITY - No fee for demolition.
STRUCTURAL PEST CONTROL - $5.00
UNDERGROUND FUEL - Value as above plus
$.10.00 fire inspection fee.
-2-
1 lOG.S Special Inspector. Add new paragraphs (e) and (f)
2 (e) In lieu of Section 106.5 (a) (b) (c) and (d) the Building
3 Official may require, at his discretion, the contractor of a commercial
4 building of 5,000 square feet or more of floor area on the ground floor
5 or an apartment house of thirty (30) or more apartments to pay the
' 6 Village of North Palm Beach an hourly inspection fee, monthly on demand.
7 The certification of the number of hours to be charged shall be made by
B the Building Official monthly. The hourly rate for the inspection f'ee
9 shall be established yearly by the Village Manager prior to 1 November
10 of each fiscal year.
11 (f) Factory Built Housing, as defined in the Florida Factory
12 13uilt Housing Act of 1971, Part IV, of Chapter 443, as amended, Florida
13 Statutes, shall be inspected by the Building Department during the
1~4 placing of the buildings on the foundations. This inspection shall cover
15 the unloading and erection of the building components and the hook-up
](, of t}ie utility lines. An hourly inspection fee, in addition to the
17 regular building permit fee, shall be charged by the Village to t}~e
' 18 contractor for regular building permit fee, shall be charged by the
19 Village to the contractor for this inspection time. The certification
20 of the number of hours inspection time to be charged shall be made by
2l the Building Department. The hourly rate for the inspection fee shall
22 he established yearly by the Village Manager prior to 1 November of
23 each fiscal year.
2~1 109.1 (a) REQUIRED FOR CERTIFICATE OF OCCUPANCY. Add new paragrap}~
25 A certificate of occupancy shall not be issued by the Building
26 Official until a certified survey of the property, locating all existing
27 improvements and property lines for said property shall be furnished to
28 the Building Official.
29 SECTION 111 - Delete Section - See Contractors Board Ordinance.
3E1 SECTION 112 - Delete Section - See Contractors Board Ordinance.
31 SECTION 113 - Delete Section - See Contractors Board Ordinance.
32 SECTION 114 - Delete entirely.
-3-
6 304. Add paragraph 11 as follows:
7 11. One and two family dwellings and private garages may be erected
8 of type VI wood frame construction in zoning classification R-1 and R-2
9 only providing such buildings are set back from side and rear property
10 lines at least ten (10) feet.
' 1.l 506 - HI GI[ RISF, SPECIAL PROVISIONS. Delete in amendment and substitute
12 the following Section 506.1.
13 506.1 - SCOPE
14 These requirements shall apply to all apartment houses, hotels and
]5 office buildings having floors used for human occupancy located more than
16 four (4) stories or forty (40) feet above the average grade. Such build-
]) ings will be required to provide sprinkler protection.
18 506.11 - Areas of Refuge - Delete.
19 509.1 - LIQUID FUEL REQUIREMENTS - Delete in amendment and substitute
20 the following:
21 1. Permit required when capacity over two gallons. It shall be
22 unlawful for any person to install, place, locate, bury, erect, or main-
, 23 tain, or to aid or assist in the installation, placing, locating, burying,
24 erecting, or maintaining any tank designed or intended to be used for the
25 storage of any liquid commonly used for fuel, such as, liquefied petroleum
2E~ Gas, gasoline, kerosene, diesel oil or like substances, having a total
27 capacity of over two gallons trpon any property or premises within t}re
28 Village, unless there first be secured from the Village Building I)epart-
29 meat a written permit.
30 Appendix M - Standards - Add:
37 1976 Standard Building Code Standard for Installation of Roof Coverings.
U
-4-
Section 3. Any person, firm, or corporation who shall
violate a provision of this Ordinance, or fail to comply therewith,
or with any of the requirements thereof, shall be guilty of a misde-
meanor. F.ach such person shall be deemed guilty of a separate offense
for each and every day or portion thereof during which any violation of
any of the provisions of this Ordinance is committed or contimaed, and
upon conviction of any such violation, such person shall be punished by
a fine of not less than fifty ($S O) dollars nor more than five hundred
($500) dollars, or by imprisonment not exceeding six (6) months, or by
both such fine or imprisonment.
Section 4. This Ordinance shall take effect immediately
1
1
upon passage.
PLACED ON FIRST READING THIS 27TH DAY OF APRIL, 1978.
YLACF;D ON PUBLIC HEARING THIS 25TH DAY OF MAY, 1978.
YLACF,D ON SECOND, FINAL READING AND PASSED THIS 25TH DAY OF MAY, 1978.
(Village Seal)
ATTEST:
/s/ Dolores R. Walker
Village Clerk
/s/ Al Moore
MAYOR