Loading...
2003-062 Osborne Park Bldg. Revovation - William Beebe• • RESOLUTION 62-2003 A RESOLUTION OF THE VILLAGE COUNCIL OF THE VILLAGE OF NORTH PALM BEACH, FLORIDA, AUTHORIZING THE MAYOR AND VILLAGE CLERK TO ENTER INTO A LETTER AGREEMENT WITH D. WILLIAM BEEBE, ARCHITECT, ATTACHED AS EXHIBIT "A", WHICH AGREEMENT IS FOR THE PURPOSE OF THE VILLAGE SECURING ARCHITECTURAL SERVICES, INCLUSIVE OF PREPARATION OF DESIGN PLANS, CONSTRUCTION DOCUMENTS AND CONSTRUCTION SITE SUPERVISION, FOR THE MODIFICATIONS AND ADDITIONS TO THE OSBORNE PARK RECREATION BUILDING LOCATED WITHIN THE VILLAGE; AND, PROVIDING FOR AN EFFECTIVE DATE. BE IT RESOLVED BY THE VILLAGE COUNCIL OF NORTH PALM BEACH, FLORIDA: Section 1. The Village Council of the Village of North Palm Beach, Florida, does hereby approve the letter agreement with D. William Beebe, architect, attached as Exhibit "A", which agreement is for the purpose of the Village securing architectural services, inclusive of preparation of design plans, construction documents and construction site supervision, for the modifications and additions to the Osborne Park recreation building located within the Village. Section 2. The Mayor and Village Clerk are hereby authorized and directed to execute the letter agreement set forth in Exhibit "A" for and on behalf of the Village of North Palm Beach. Section 3. This resolution shall take effect immediately upon its adoption. ~~ A PASSED AND ADOPTED THIS 13th DAY OF NOVEMBER, 2003. D. WILLIAM: BEEl3E, ARCHITECT • 3950 RCA Blvd. Suite 5050 `Palm Beach Gardens, FL 33410 'Tel (561) 493-8550 `Fax (561) 624-9952 Florida Registration #AR 0004073 July 31, 2003 Ms. Kristine A. Frazell, P.E Director of Public Services 645 Prosperity Farms Road North Palm Beach, FL 33408 ~C'Ej~1 RE: Osborne Park Recreation Building ~Y~OV ®6 20p3 Architectural Agreement ~ Dear Ms. Frazell: The purpose of this letter is for same to serve as the Owner/Architect Agreement to complete the construction documents and provide additional services noted for the modifications and additions to the Osborne park Recreation Building located on Prosperity Farms Road in Osborne Park per approved preliminary and conceptual plans. Scope Of Work to include all meetings, conferences, research, design, construction documents and site supervision. The fee includes atl civil aspects including sewer, water, etc. and an Allowance of $1,500 for surveying required to locate the Recreation Building and proposed Restroom Building. It is our understanding that the Restroom Building will be free-standing and will be site constructed. Documents listed will be completed within thirty (30) days after acceptance of this proposal and receipt of the stated retainer. Total Fee will be based on 6% of construction cost not to exceed Eleven Thousand, Five Hundred and no/100 ($11,500.00) dollars. Fee to be paid as follows: Retainer due when Agreement is signed $ 1,500 Due when construction documents are complete 5,000 Due when price is established 2,700' Due monthly at same %age as Contractor Requisition 2 300 TOTAL MAXIMUM FEE $ 11,500' • Amount adjusted, if required, should 6% of construction cost be less than the quoted maximum. • Page Two July 31, 2003 If the Owner elects to delay either bidding or constructing the project in excess of sixty (60) days after completion of documents making the %age calculation impossible, the Architect will be paid based on the above breakdown or a total of $9,200. If the Scope of Work is changed or added to requiring revisions to drawings or additional services, same will be charged at the rate of $125 per hour for Architect, $75 per hour for drafting. The Architect will furnish twelve (12) sets of documents and an Electronic File (CAD). Additional sets will be billed at cost. If this meets with your approval, please sign and return one (1) copy to my office prior to services being rendered. Very 4ruly yours, ACCEPTED: / Date: //~ o?O - D 3 William Beebe VILLAGE,A~NO$TH~ALIWI3,EACH Architect DWB/nt Title: / y~~-YOif'/ By: ~-. •